Yaupon Solar Project (Hybrid)Cattlemen Solar Park — Under construction · Solar · TX · 240 MW · 0.4 mi awayCattlemen Solar II — Under construction · Solar · TX · 200 MW · 2.7 mi awaySB ENERGY - ORION DATA CENTER — Under construction · Large load · TX · 9.5 mi awayFREEBIRD DATA CENTER — Under construction · Large load · TX · 9.7 mi awayMajor Oak Power — Postponed · Coal · TX · 600 MW · 9.8 mi awayProject Orion (Burlington data centre) — Filed · Large load · TX · 10.0 mi awayRosebud Solar, LLC — Postponed · Solar · TX · 132 MW · 11.5 mi awayTidwell Prairie II — Built · Storage · TX · 203.6 MW · 11.8 mi awayBarton Branch IA — Under construction · Storage · TX · 200 MW · 11.8 mi awayBee Branch IA — Under construction · Storage · TX · 200 MW · 11.8 mi awayTwo Rivers Solar — Postponed · Solar · TX · 214 MW · 14.0 mi away
  • Wind & solar
  • Storage
  • Loads
  • In development
  • Under construction
  • Operating
  • Size not stated
  • 10 · 100 · 1,000 MW

Yaupon Solar Project (Hybrid)

Solar + storage

Capacity
Capacity: sourceEIA-860M · Open licenseMW
Queue position
24INR0042, 24INR0169
In-service date
(stated)
Location
Milam County, Texas

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Kind
Generation
Technology
Solar + storage source: “Solar - Photovoltaic Solar”
Capacity (MW)
300.8 Capacity is the interconnection request plus the generators, listed under Sources, whose technology no request covers.
Connects at
to Tap 345 kV Gibson Switch (3706) – TNP One (39950)Connection point300.8 MW active (1 of 1 projects).
EIA plant
66216 2 generatorsEIA generatorsPlant 66216 BESS, SOL

Timeline

  • Stated In-service date stated by ERCOT.
  • Observed as under construction in ERCOT (source status: “Completed”).

“Stated” dates are the source’s plan, not a commitment.

About these dates

Status: the most advanced any source reports, dated by that source. Later changes follow as we see them.

Sources

2 sources

Sources EIA-860M · ERCOT

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • ERCOTOpen license · retrieved Nov 4, 2026

Every source and license · Attribution

View at source

Report a problem

Around this project

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Cattlemen Solar Park Under construction Solar 0.4 mi 240
Cattlemen Solar II Under construction Solar 2.7 mi 200
SB ENERGY - ORION DATA CENTER Under construction Large load 9.5 mi
FREEBIRD DATA CENTER Under construction Large load 9.7 mi
Major Oak Power Postponed Coal 9.8 mi 600
Project Orion (Burlington data centre) Filed Large load 10.0 mi
Rosebud Solar, LLC Postponed Solar 11.5 mi 132
Tidwell Prairie II Built Storage 11.8 mi 203.6
Barton Branch IA Under construction Storage 11.8 mi 200
Bee Branch IA Under construction Storage 11.8 mi 200
Two Rivers Solar Postponed Solar 14.0 mi 214

Sources EIA-860M · EPA ICIS-NPDES · FAA OE/AAA · ERCOT

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • EPA ICIS-NPDESOpen license · retrieved Nov 16, 2026
  • FAA OE/AAAOpen license · retrieved Nov 16, 2026
  • ERCOTOpen license · retrieved Nov 4, 2026

Attribution