Show on map
- Storage
- Loads
- In development
- Under construction
- Operating
- Size not stated
- Other infrastructure
- 10 · 100 · 1,000 MW
Map
- Storage
- Loads
- In development
- Under construction
- Operating
- Size not stated
- Other infrastructure
Abilene South 138 kV line: route and 4 exact-grade projects within 15 mi. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Abilene South 138 kV line
Transmission line
- Mapped route length
- Mapped route length: sourceLBNL · Open license, with creditmiles
- Voltage
- 138 kV
- States crossed
- US-TX
- Owner (as stated)
- AEP Texas
Details
Who’s behind it
- Owner
- AEP Texas
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Mapped route length (miles)
- 0
- Substations at the ends (as the source names them)
- Abilene South
All 3 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
| Attribute | Value |
|---|---|
| Owner, as the source states it | aep texas |
| HIFLD line ID | 311076 |
| Voltage class | 100-161 kV |
Sources
1 sourceSources LBNL
Sources
- LBNLYin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.
Around this line
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| Chimney Rock BESS Studied | Storage | 5.8 mi | 156 |
| ABILENE DATA CENTER PH3 BLDGS 9-10 Under construction | Large load | 9.2 mi | |
| LONGHORN DATA CENTER Built | Large load | 10.4 mi | |
| Summerhill BESS Announced | Storage | 10.8 mi | 143 |
Sources ERCOT · EIA-860M · EPA ICIS-NPDES · FAA OE/AAA · EPA ICIS-Air