Show on map
AC Landfill Energy LLC — Power plant · Biomass · AC Landfill Energy LLCAC Power 2 — Postponed · Solar · NJ · 3.8 MW · 4.1 mi awayHarrah's Atlantic City - POI 1 (Meeting — Under construction · Solar · NJ · 2.3 MW · 6.6 mi awayB L England — Postponed · Gas, combined cycle · NJ · 321 MW · 10.1 mi away
  • Wind & solar
  • Bioenergy
  • Under construction
  • Retired
  • 10 · 100 · 1,000 MW

AC Landfill Energy LLC

Power plant · Biomass

Key facts

Power plant · Biomassran 32% of 2020 Retired
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2005
Net generation, 2020
15,231 MWh
Location
Atlantic County, New Jersey

Output

Net generation MWh by year, 2011 to 2021
Fuel burned MMBtu by year, 2011 to 2021
  • Biomass and waste

Operations detail

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Biomass source: “Landfill Gas”
Age
21 years since 2005
All 2 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
EPA greenhouse gas reporting (GHGRP)
EPA FRS ID
110022939454
Subparts reported
C, HH
NAICS code
562212
Subpart PP (CO2 supply)
No
Subpart RR (geologic sequestration)
No
Subpart UU (CO2 injection)
No
Reporting year
2023
GHGRP facility ID
1001858
Balancing authority codePJM

Retirement

EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.
Retired
September 2021
First unit retired
December 2016
Capacity retired
5.4 MW
Generators retired
3
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
UNIT3Landfill Gas1.9 MWRetiredDecember 2016
UNIT1Landfill Gas1.6 MWRetiredSeptember 2021
UNIT2Landfill Gas1.9 MWRetiredSeptember 2021

Grid

EIA-860Grid fieldsAs the plant reported them to EIA-860 (Schedule 2).
Balancing authority
PJM
Transmission lines within 15 mi (10)
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Ownership

2 companies2
Companies with an ownership or operating interest in this asset.
CompanyRoleShareAs ofSource
AC Landfill Energy LLC Operator EIA-860M
ATLANTIC COUNTY UTILITIES AUTHORITY Owner 100.0% Dec 31, 2023 EPA GHGRP

Timeline

  • Stated Units UNIT1, UNIT2 scheduled to retire, 3.5 MW · EIA-860M
  • Stated Unit UNIT3 scheduled to retire, 1.9 MW · EIA-860M
  • In service · EIA-860M

Sources

5 sources

Sources EIA-860M · LBNL · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory · EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT)

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
AC Power 2 Postponed Solar 4.1 mi 3.8
Harrah's Atlantic City - POI 1 (Meeting Under construction Solar 6.6 mi 2.3
B L England Postponed Gas, combined cycle 10.1 mi 321