Show on map
AC Power — Power plant · Solar · Altus Power America Management, LLCAMAZON DATA SVCS INC PNE100 — Built · Large load · PA · 12.5 mi away365 DATA CENTERS — Built · Large load · PA · 13.5 mi awayH5 DATA CENTERS — Built · Large load · PA · 13.5 mi awayCROSS CONNECT SOLUTIONS — Built · Large load · PA · 13.5 mi awayEQUINIX — Large load · PA · 13.5 mi awayVicinity Energy Trenton, L.P. — Postponed · Gas, combustion turbine · NJ · 9.2 MW · 14.6 mi away
  • Wind & solar
  • Loads
  • Operating
  • Stage not stated
  • Size not stated
  • 10 · 100 · 1,000 MW

Power plant · Solar

Key facts

Power plant · Solarran 18% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2019
Net generation, 2025
2,051 MWh
Grid
13 kV to Public Service Elec & Gas Co (PJM)
Location
Burlington County, New Jersey
Operated by
Altus Power America Management, LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2019 to 2025

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Solar source: “Solar Photovoltaic”
Age
7 years since 2019
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Gem
Unit ids
G100000814343
Location id
L100000811775
Eia plant ids
63260
Grid
Nerc region
RFC
Report year
2025
Grid voltage kv
13.20
Transmission owner
Public Service Elec & Gas Co
Balancing authority code
PJM
Balancing authority name
PJM Interconnection, LLC
Fuel burned (MMBtu), 20256,997
Capacity factor, 20250.180
Net generation (MWh), 20252,051
Balancing authority codePJM

Solar array

Array area (acres)
4.9
AC capacity (MW)
1.3
DC capacity (MW)
1.6
Mounting
Fixed tilt
Site type
Landfill (on EPA's RE-Powering list)
Began operating
2019

Source USPVDB

Source

  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb

Attribution

Timeline

  • In service · EIA-860M

Sources

5 sources

Sources EIA-860M · GEM · USPVDB · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
  • EIA-860M Preliminary Monthly Electric Generator Inventory

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
AMAZON DATA SVCS INC PNE100 Built Large load 12.5 mi
365 DATA CENTERS Built Large load 13.5 mi
H5 DATA CENTERS Built Large load 13.5 mi
CROSS CONNECT SOLUTIONS Built Large load 13.5 mi
EQUINIX Unknown Large load 13.5 mi
Vicinity Energy Trenton, L.P. Postponed Gas, combustion turbine 14.6 mi 9.2

Sources EPA ICIS-Air · EIA-860M

Sources

Attribution