Show on map
ACE ENERGY LLC, HALL & MUSKA — Petroleum product terminalEllington Solar One — Postponed · Solar · CT · 2 MW · 3.6 mi awayCT Airport Authority Solar One — Announced · Solar · CT · 4 MW · 7.5 mi awayWindsor Locks — Under construction · Solar · CT · 1.8 MW · 8.3 mi awayDollar Tree Solar One — Postponed · Solar · CT · 2 MW · 10.2 mi awayBroadleaf Solar — Filed · Solar · CT · 200 MW · 13.2 mi awayWillington Solar One, LLC — Under construction · Solar · CT · 2 MW · 13.3 mi awayHomestead Fuel Cell — Postponed · Gas, other · CT · 8.4 MW · 14.1 mi awayHartford Hospital Cogeneration — Postponed · Gas, combustion turbine · CT · 11.5 MW · 14.4 mi awayPalmer Renewable Energy — Postponed · Biomass · MA · 42 MW · 14.4 mi away
  • Wind & solar
  • In development
  • Under construction
  • Other infrastructure
  • 10 · 100 · 1,000 MW

Ace Energy LLC, Hall & Muska

Petroleum product terminal

As filed: ACE ENERGY LLC, HALL & MUSKA

Key facts

Petroleum product terminal Operating
Location
Connecticut

Details

Who’s behind it

Owner
Ace Energy LLCSourceEIA US Energy Atlas — Petroleum Product Terminals (points; owner company, EIA-815)

Interested in this project?

Set an alert
More Book a call Join the beta
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.

Capacity not stated

All 5 attributes from EIA US Energy Atlas — Petroleum Product Terminals (points; owner company, EIA-815)
Attributes
AttributeValue
Padd1
SiteHALL & MUSKA
SurveyEIA-815
Owner, as the source states itACE ENERGY LLC
Source release202109

Sources

2 sources

Sources EIA Energy Atlas · EIA US Energy Atlas — Petroleum Product Terminals (points; owner company, EIA-815)

Sources

Every source and license · Attribution

View at source

Around this asset

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Ellington Solar One Postponed Solar 3.6 mi 2
CT Airport Authority Solar One Announced Solar 7.5 mi 4
Windsor Locks Under construction Solar 8.3 mi 1.8
Dollar Tree Solar One Postponed Solar 10.2 mi 2
Broadleaf Solar Filed Solar 13.2 mi 200
Willington Solar One, LLC Under construction Solar 13.3 mi 2
Homestead Fuel Cell Postponed Gas, other 14.1 mi 8.4
Hartford Hospital Cogeneration Postponed Gas, combustion turbine 14.4 mi 11.5
Palmer Renewable Energy Postponed Biomass 14.4 mi 42

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution