Show on map
- Wind & solar
- In development
- Under construction
- Other infrastructure
- 10 · 100 · 1,000 MW
Map
- Wind & solar
- In development
- Under construction
- Other infrastructure
ACE ENERGY LLC, HALL & MUSKA: location and 9 exact-grade projects within 15 mi. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Ace Energy LLC, Hall & Muska
Petroleum product terminal
As filed: ACE ENERGY LLC, HALL & MUSKA
Key facts
Petroleum product terminal Operating- Location
- Connecticut
Details
Who’s behind it
- Owner
- Ace Energy LLCSourceEIA US Energy Atlas — Petroleum Product Terminals (points; owner company, EIA-815)
Interested in this project?
Set an alert
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
Capacity not stated
All 5 attributes from EIA US Energy Atlas — Petroleum Product Terminals (points; owner company, EIA-815)
| Attribute | Value |
|---|---|
| Padd | 1 |
| Site | HALL & MUSKA |
| Survey | EIA-815 |
| Owner, as the source states it | ACE ENERGY LLC |
| Source release | 202109 |
Sources
2 sourcesSources EIA Energy Atlas · EIA US Energy Atlas — Petroleum Product Terminals (points; owner company, EIA-815)
Sources
- EIA Energy AtlasSource: U.S. Energy Information Administration, U.S. Energy Atlas, Petroleum Product Terminals (as of September 2021)
- EIA US Energy Atlas — Petroleum Product Terminals (points; owner company, EIA-815)
Around this asset
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| Ellington Solar One Postponed | Solar | 3.6 mi | 2 |
| CT Airport Authority Solar One Announced | Solar | 7.5 mi | 4 |
| Windsor Locks Under construction | Solar | 8.3 mi | 1.8 |
| Dollar Tree Solar One Postponed | Solar | 10.2 mi | 2 |
| Broadleaf Solar Filed | Solar | 13.2 mi | 200 |
| Willington Solar One, LLC Under construction | Solar | 13.3 mi | 2 |
| Homestead Fuel Cell Postponed | Gas, other | 14.1 mi | 8.4 |
| Hartford Hospital Cogeneration Postponed | Gas, combustion turbine | 14.4 mi | 11.5 |
| Palmer Renewable Energy Postponed | Biomass | 14.4 mi | 42 |
Sources EIA-860M