Show on map
Windsor LocksCT Airport Authority Solar One — Announced · Solar · CT · 4 MW · 1.4 km awayDollar Tree Solar One — Postponed · Solar · CT · 2 MW · 3.4 km awayBroadleaf Solar — Filed · Solar · CT · 200 MW · 7.9 km awayEllington Solar One — Postponed · Solar · CT · 2 MW · 15.1 km awayHomestead Fuel Cell — Postponed · Gas, other · CT · 8.4 MW · 16.1 km awayHartford Hospital Cogeneration — Postponed · Gas, combustion turbine · CT · 11.5 MW · 18.4 km awayNU - WETHERSFIELD DATA CENTER — Built · Large load · CT · 23.2 km away
  • Wind & solar
  • Loads
  • In development
  • Under construction
  • Operating
  • Size not stated
  • 10 · 100 · 1,000 MW

Windsor Locks

Solar

Capacity
Capacity: sourceEIA-860M · Open licenseMW
In-service date
(stated)
Location
Hartford County, Connecticut

Details

Who’s behind it

Developer
ENGIE Distributed Renewables Development LLC · part of ENGIE North AmericaOwnership claimOwnership link recorded from the companies' own published statements; no date stated by the source.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Kind
Generation
Technology
Solar source: “Solar Photovoltaic”
EIA plant
69807 generator WNSRL

Timeline

  • Observed as under construction in EIA-860M (source status: “(U) Under construction, less than or equal to 50 percent complete”).
  • Stated In-service date stated by EIA-860M.

“Stated” dates are the source’s plan, not a commitment.

About these dates

Status and dates as the source last listed them. Later changes follow as we see them.

Sources

1 source

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Every source and license · Attribution

View at source

Report a problem

Around this project

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
CT Airport Authority Solar One Announced Solar 1.4 km 4
Dollar Tree Solar One Postponed Solar 3.4 km 2
Broadleaf Solar Filed Solar 7.9 km 200
Ellington Solar One Postponed Solar 15.1 km 2
Homestead Fuel Cell Postponed Gas, other 16.1 km 8.4
Hartford Hospital Cogeneration Postponed Gas, combustion turbine 18.4 km 11.5
NU - WETHERSFIELD DATA CENTER Built Large load 23.2 km

Sources EIA-860M · EPA ICIS-Air

Sources

Attribution