Show on map
ACE-Stanton PV — Power plant · Solar · ACE-Stanton, LLCCurtis H Stanton Energy Center — Postponed · Coal · FL · 329 MW · 1.1 mi awayVERIZON ORLANDO DATA CENTER — Built · Large load · FL · 8.7 mi away
  • Wind & solar
  • Loads
  • Operating
  • Size not stated
  • 10 · 100 · 1,000 MW

ACE-Stanton PV

Power plant · Solar

Key facts

Power plant · Solarran 21% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2017
Net generation, 2025
8,712 MWh
Grid
12 kV to Orlando Utilities Comm (FMPP)
Location
Orange County, Florida
Operated by
ACE-Stanton, LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2017 to 2025

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Solar source: “Solar Photovoltaic”
Age
9 years since 2017
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Gem
Unit ids
G100000814348
Location id
L100000811780
Eia plant ids
61246
Grid
Nerc region
SERC
Report year
2025
Grid voltage kv
12.50
Transmission owner
Orlando Utilities Comm
Balancing authority code
FMPP
Balancing authority name
Florida Municipal Power Pool
Fuel burned (MMBtu), 202529,724
Capacity factor, 20250.207
Net generation (MWh), 20258,712
Balancing authority codeFMPP

Solar array

Array area (acres)
14.2
AC capacity (MW)
4.8
DC capacity (MW)
6.8
Mounting
Fixed tilt
Site type
Greenfield
Began operating
2017

Source USPVDB

Source

  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb

Attribution

Timeline

  • In service · EIA-860M

Sources

5 sources

Sources EIA-860M · GEM · USPVDB · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
  • EIA-860M Preliminary Monthly Electric Generator Inventory

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Curtis H Stanton Energy Center Postponed Coal 1.1 mi 329
VERIZON ORLANDO DATA CENTER Built Large load 8.7 mi

Sources EIA-860M · EPA ICIS-NPDES

Sources

Attribution