Show on map
ACUA — Power plant · Storage · Viridity Energy Solutions, Inc.Harrah's Atlantic City - POI 1 (Meeting — Under construction · Solar · NJ · 2.3 MW · 1.0 mi awayAC Power 2 — Postponed · Solar · NJ · 3.8 MW · 9.8 mi awayB L England — Postponed · Gas, combined cycle · NJ · 321 MW · 12.0 mi away
  • Wind & solar
  • Storage
  • Under construction
  • Operating
  • 10 · 100 · 1,000 MW

Power plant · Storage

Key facts

Power plant · Storage Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2018
Net generation, 2025
-112 MWh
Grid
13 kV to Atlantic City Electric Co (PJM)
Location
Atlantic County, New Jersey
Operated by
Viridity Energy Solutions, Inc.SourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2018 to 2025

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Storage source: “Batteries”
Age
8 years since 2018
All 4 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Grid
Nerc region
RFC
Report year
2025
Grid voltage kv
13.20
Transmission owner
Atlantic City Electric Co
Balancing authority code
PJM
Balancing authority name
PJM Interconnection, LLC
Fuel burned (MMBtu), 20250
Net generation (MWh), 2025-112
Balancing authority codePJM
Data notes (1)
  • Capacity factor, 2025 not shown: net generation -112.0 MWh is not positive (the plant consumed at least as much as it produced over the year)

Timeline

  • In service · EIA-860M

Sources

3 sources

Sources EIA-860M · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Harrah's Atlantic City - POI 1 (Meeting Under construction Solar 1.0 mi 2.3
AC Power 2 Postponed Solar 9.8 mi 3.8
B L England Postponed Gas, combined cycle 12.0 mi 321

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution