Show on map
Adams Community Solar Garden LLC — Power plant · Solar · Adams Community Solar Garden LLCPivot Solar 43 LLC — Under construction · Solar · CO · 3.5 MW · 5.1 mi awayPivot Solar 53 LLC — Under construction · Solar · CO · 4 MW · 5.1 mi awayDEN1-DC2 (Aurora data centre) — Filed · Large load · CO · 7.7 mi awayQTS AURORA LLC - QTS DEN1 — Built · Large load · CO · 7.9 mi awayJPMORGAN CHASE - PROJECT SYCAMORE AURORA — Built · Large load · CO · 8.0 mi awayAPA060 - Phase 5 MDC (Aurora data centre) — Built · Large load · CO · 10.2 mi awaySAMARITANS PURSE DATA CENTER — Built · Large load · CO · 10.2 mi awayAMAZON DATA SERVICES - DEN-22 — Built · Large load · CO · 11.2 mi away
  • Wind & solar
  • Loads
  • In development
  • Under construction
  • Operating
  • Size not stated
  • 10 · 100 · 1,000 MW

Adams Community Solar Garden LLC

Power plant · Solar

Key facts

Power plant · Solarran 26% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2015
Net generation, 2025
2,759 MWh
Grid
13 kV to Public Service Co of Colorado (PSCO)
Location
Adams County, Colorado
Operated by
Adams Community Solar Garden LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2015 to 2025

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert
More Book a call Join the beta
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
Technology
Solar source: “Solar Photovoltaic”
Age
11 years since 2015
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Gem
Unit ids
G100000814363
Location id
L100000811794
Eia plant ids
59849
Grid
Nerc region
WECC
Report year
2025
Grid voltage kv
13.20
Transmission owner
Public Service Co of Colorado
Balancing authority code
PSCO
Balancing authority name
Public Service Company of Colorado
Fuel burned (MMBtu), 20259,415
Capacity factor, 20250.263
Net generation (MWh), 20252,759
Balancing authority codePSCO

Solar array

Array area (acres)
9.1
AC capacity (MW)
1.2
DC capacity (MW)
1.5
Mounting
Single-axis tracking
Site type
Greenfield
Began operating
2015

Source USPVDB

Source

  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb

Attribution

Timeline

  • In service · EIA-860M

Sources

5 sources

Sources EIA-860M · GEM · USPVDB · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
  • EIA-860M Preliminary Monthly Electric Generator Inventory

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Pivot Solar 43 LLC Under construction Solar 5.1 mi 3.5
Pivot Solar 53 LLC Under construction Solar 5.1 mi 4
DEN1-DC2 (Aurora data centre) Filed Large load 7.7 mi
QTS AURORA LLC - QTS DEN1 Built Large load 7.9 mi
JPMORGAN CHASE - PROJECT SYCAMORE AURORA Built Large load 8.0 mi
APA060 - Phase 5 MDC (Aurora data centre) Built Large load 10.2 mi
SAMARITANS PURSE DATA CENTER Built Large load 10.2 mi
AMAZON DATA SERVICES - DEN-22 Built Large load 11.2 mi

Sources EIA-860M · FAA OE/AAA · EPA ICIS-Air · EPA ICIS-NPDES

Sources

Attribution