Show on map
Adams — Power plant · Solar · Adams Solar SC, LLCWebster Solar — Solar · SC · 5.4 MW · 4.1 km awayGedosch Solar II — Solar · SC · 2 MW · 15.5 km awayDC Blox Inc Data Center Expansion — Large load · SC · 20.8 km awayIWS ANDERSON DATA CENTER PROJECT PHASE 2 — Large load · SC · 23.3 km away
  • Wind & solar
  • Loads
  • Under construction
  • Operating
  • Size not stated
  • 10 · 100 · 1,000 MW

Power plant · Solar

Key facts

Power plant · Solarran 25% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2021
Net generation, 2025
4,304 MWh
Grid
12 kV to Duke Energy Carolinas, LLC (DUK)
Location
Anderson County, South Carolina
Operated by
Adams Solar SC, LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2021 to 2025

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Solar source: “Solar Photovoltaic”
Age
5 years since 2021
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Gem
Unit ids
G100000814369
Location id
L100000811800
Eia plant ids
64682
Grid
Nerc region
SERC
Report year
2025
Grid voltage kv
12.50
Transmission owner
Duke Energy Carolinas, LLC
Balancing authority code
DUK
Balancing authority name
Duke Energy Carolinas
Fuel burned (MMBtu), 202514,685
Capacity factor, 20250.246
Net generation (MWh), 20254,304
Balancing authority codeDUK

Solar arrays

Array area (acres)
10.2
AC capacity (MW)
2
DC capacity (MW)
2.8
Mounting
Single-axis tracking
Site type
Greenfield
Began operating
2021

Source USPVDB

Source

  • U.S. Large-Scale Solar Photovoltaic DatabaseOpen license · retrieved 25 Oct 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb

Attribution

Timeline

  • In service · EIA-860M

Sources

5 sources

Sources EIA-860M · GEM · USPVDB · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
Webster Solar Postponed Solar 4.1 km 5.4
Gedosch Solar II Postponed Solar 15.5 km 2
DC Blox Inc Data Center Expansion Built Large load 20.8 km
IWS ANDERSON DATA CENTER PROJECT PHASE 2 Under construction Large load 23.3 km