Show on map
Addicks - Th Wharton Power Plant 138 kV — Transmission lineSERVERFARM LONGHORN — Under construction · Large load · TX · 4.0 mi awayBESS TX Camarine - BSHOU001 — Under construction · Storage · TX · 9.9 MW · 7.9 mi awaySMT DC Houston 1 (Tomball data centre) — Filed · Large load · TX · 10.3 mi awayJohn Paul Jones — Postponed · Gas, reciprocating engine · TX · 18.7 MW · 10.7 mi awaySMT DC Houston II (Houston data centre) — Filed · Large load · TX · 13.2 mi awayCallisto II Energy Center — Under construction · Storage · TX · 303.2 MW · 14.2 mi awayPamela Heights I Energy Center — Under construction · Storage · TX · 101.7 MW · 14.2 mi away
  • Storage
  • Loads
  • In development
  • Under construction
  • Size not stated
  • Other infrastructure
  • 10 · 100 · 1,000 MW

Addicks - Th Wharton Power Plant 138 kV

Transmission line

Mapped route length
Mapped route length: sourceLBNL · Open license, with creditmiles
Voltage
138 kV
States crossed
US-TX
Owner (as stated)
Centerpoint Energy Houston Electric

Details

Who’s behind it

Owner
Centerpoint Energy Houston Electric

Interested in this project?

Set an alert
More Book a call Join the beta
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
Mapped route length (miles)
11
Substations at the ends (as the source names them)
Addicks to Th Wharton Power Plant
All 3 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
Attributes
AttributeValue
Owner, as the source states itcenterpoint energy houston electric
HIFLD line ID303336
Voltage class100-161 kV

Sources

1 source

Sources LBNL

Sources

  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.

Every source and license · Attribution

View at source

Around this line

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
SERVERFARM LONGHORN Under construction Large load 4.0 mi
BESS TX Camarine - BSHOU001 Under construction Storage 7.9 mi 9.9
SMT DC Houston 1 (Tomball data centre) Filed Large load 10.3 mi
John Paul Jones Postponed Gas, reciprocating engine 10.7 mi 18.7
SMT DC Houston II (Houston data centre) Filed Large load 13.2 mi
Callisto II Energy Center Under construction Storage 14.2 mi 303.2
Pamela Heights I Energy Center Under construction Storage 14.2 mi 101.7

Sources EPA ICIS-NPDES · EIA-860M · FAA OE/AAA · ERCOT

Sources

  • EPA ICIS-NPDESOpen license · retrieved Nov 16, 2026
  • EIA-860MOpen license · retrieved Nov 4, 2026
  • FAA OE/AAAOpen license · retrieved Nov 23, 2026
  • ERCOTOpen license · retrieved Nov 4, 2026

Attribution