BESS TX Camarine - BSHOU001: the source's site coordinate and 5 exact-grade projects within 15 mi. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
BESS TX Camarine - BSHOU001
Storage
Key facts
Storage Under construction (source status: (U) Under construction, less than or equal to 50 percent complete) (what this status means)- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- In-service date
- (stated)
- Location
- Harris County, Texas
Details
Who’s behind it
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Kind
- Storage source: “Batteries”
- EIA plant
- 69246 generator BSOU1
Timeline
- Stated In-service date stated by EIA-860M.
- Observed as under construction in EIA-860M (source status: “(U) Under construction, less than or equal to 50 percent complete”).
- EIA-860M Preliminary Monthly Electric Generator Inventory: Proposed cod 2026-11-01 → 2027-01-01.
“Stated” dates are the source’s plan, not a commitment.
About these dates
Status and dates as the source last listed them. Later changes follow as we see them.
Sources
1 sourceSources EIA-860M
Around this project
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| TX Houston 7080 Express Lane Postponed | Storage | 11.4 mi | 1.5 |
| SERVERFARM LONGHORN Under construction | Large load | 12.0 mi | |
| SMT DC Houston II (Houston data centre) Filed | Large load | 12.3 mi | |
| Greens Bayou 6 Under construction | Gas, combustion turbine | 13.1 mi | 445 |
| CPV Pondera King Energy Center Postponed | Gas, combined cycle | 13.1 mi | 900 |
Sources EIA-860M · EPA ICIS-NPDES · FAA OE/AAA · ERCOT