Show on map
- Combustion
- Wind & solar
- In development
- Under construction
- Other infrastructure
- 10 · 100 · 1,000 MW
Map
- Combustion
- Wind & solar
- In development
- Under construction
- Other infrastructure
Aegis: route and 7 exact-grade projects within 25 km. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Aegis
HGL pipeline
Key facts
HGL pipeline Operating- Mapped route length
- Mapped route length: sourceEIA Energy Atlas · Open licensemiles
- States crossed
- US-LA, US-TX
- Operated by
- Enterprise ProductsSourceEIA US Energy Atlas — Hydrocarbon Gas Liquids (HGL) Pipelines (line geometries, operator, pipeline name)
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Mapped route length (miles)
- 201
- Units
- 2
All 5 attributes from EIA US Energy Atlas — Hydrocarbon Gas Liquids (HGL) Pipelines (line geometries, operator, pipeline name)
| Attribute | Value |
|---|---|
| Mapped parts | 2 |
| Operator, as the source states it | ENTERPRISE PRODUCTS |
| Mapped segments | 2 |
| Source release | 202001 |
| Pipeline name raw | Aegis |
Sources
2 sourcesSources EIA Energy Atlas · EIA US Energy Atlas — Hydrocarbon Gas Liquids (HGL) Pipelines (line geometries, operator, pipeline name)
Sources
- EIA US Energy Atlas — Hydrocarbon Gas Liquids (HGL) Pipelines (line geometries, operator, pipeline name)Source: U.S. Energy Information Administration, U.S. Energy Atlas, HGL Pipelines (as of January 2020)
- EIA US Energy Atlas — Hydrocarbon Gas Liquids (HGL) Pipelines (line geometries, operator, pipeline name)
Around this pipeline
Nearby
within 25 km| Project | Kind | Away | MW |
|---|---|---|---|
| Orange County Advanced Power Station Under construction | Gas, combined cycle | 3.7 km | 1,306 |
| Cypress Harvest Solar Station Announced | Solar + storage | 8.7 km | 400 |
| Luicain Solar Postponed | Solar | 9.0 km | 65 |
| Geismar Postponed | Gas, combustion turbine | 11.6 km | 70 |
| Westlake Power Station Announced | Gas, combined cycle | 12.8 km | 819.4 |
| Legend Power Station Studied | Gas, other | 15.5 km | 820 |
| Amelia Energy Center Postponed | Gas, combined cycle | 19.2 km | 900 |
Sources EIA-860M · Berkeley Lab
Sources
- EIA-860M Preliminary Monthly Electric Generator Inventory
- LBNL "Queued Up" project-level interconnection queue data file (non-ISO regions)Lawrence Berkeley National Laboratory and GridTracker, Queued Up data file (2026 edition), CC BY 4.0. Modified by Inframation: non-ISO and MISO regions only; MISO rows labelled with the date the file's queue data runs to; statuses and technologies mapped to Inframation's vocabulary. Queued Up Data File. Copyright (c) 2026, The Regents of the University of California, through Lawrence Berkeley National Laboratory (subject to receipt of any required approvals from the U.S. Dept. of Energy) & GridTracker.