AES Deepwater — Power plant · Oil · AES Deepwater IncTexas Petrochemicals — Postponed · Gas, combined cycle · TX · 560 MW · 2.1 mi awayGreens Bayou 6 — Under construction · Gas, combustion turbine · TX · 445 MW · 7.3 mi awayTX Houston 7080 Express Lane — Postponed · Storage · TX · 1.5 MW · 7.6 mi awayTX LaPort 10060 Porter Road Solar — Postponed · Solar · TX · 1.6 MW · 9.2 mi awayNET Power La Porte Station — Studied · Gas, combustion turbine · TX · 25.5 MW · 11.5 mi awayCPV Pondera King Energy Center — Postponed · Gas, combined cycle · TX · 900 MW · 13.3 mi awayPamela Heights I Energy Center — Under construction · Storage · TX · 101.7 MW · 14.3 mi awayCallisto II Energy Center — Under construction · Storage · TX · 303.2 MW · 14.3 mi away
  • Combustion
  • Storage
  • In development
  • Under construction
  • Retired
  • 10 · 100 · 1,000 MW

AES Deepwater

Power plant · Oil

Key facts

Power plant · Oilran 7% of 2013 Retired
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1986
Net generation, 2013
98,536 MWh
Location
Harris County, Texas

Output

Net generation MWh by year, 2001 to 2013
Fuel burned MMBtu by year, 2001 to 2013
  • Gas
  • Oil

Operations detail

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Oil source: “Petroleum Coke”
Age
40 years since 1986
All 2 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
EPA greenhouse gas reporting (GHGRP)
EPA FRS ID
110000462785
NAICS code
221119
Subpart PP (CO2 supply)
No
Subpart RR (geologic sequestration)
No
Subpart UU (CO2 injection)
No
Reporting year
2023
GHGRP facility ID
1000281
Balancing authority codeERCO

Retirement

EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.
Retired
September 2013
Capacity retired
166.2 MW
Generators retired
2
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
GEN1Petroleum Coke165.2 MWRetiredSeptember 2013
REDSTBatteries1 MWRetiredSeptember 2013
By technology
Nameplate capacity retired or scheduled to retire, by technology
TechnologyRetiredScheduled to retire
Petroleum Coke165.2 MW
Batteries1 MW

Grid

EIA-860Grid fieldsAs the plant reported them to EIA-860 (Schedule 2).
Balancing authority
ERCO
Transmission lines within 15 mi (10)
Connection points within 15 mi (4)
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Ownership

2 companies2
Companies with an ownership or operating interest in this asset.
CompanyRoleShareAs ofSource
AES Deepwater Inc Operator EIA-860M
AES Corp Owner 100.0% Dec 31, 2023 EPA GHGRP

Timeline

  • Stated Units GEN1, REDST scheduled to retire, 166.2 MW · EIA-860M
  • In service · EIA-860M

Sources

6 sources

Sources EIA-860M · OpenStreetMap · ERCOT · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory · EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT)

© OpenStreetMap contributors

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Texas Petrochemicals Postponed Gas, combined cycle 2.1 mi 560
Greens Bayou 6 Under construction Gas, combustion turbine 7.3 mi 445
TX Houston 7080 Express Lane Postponed Storage 7.6 mi 1.5
TX LaPort 10060 Porter Road Solar Postponed Solar 9.2 mi 1.6
NET Power La Porte Station Studied Gas, combustion turbine 11.5 mi 25.5
CPV Pondera King Energy Center Postponed Gas, combined cycle 13.3 mi 900
Pamela Heights I Energy Center Under construction Storage 14.3 mi 101.7
Callisto II Energy Center Under construction Storage 14.3 mi 303.2

Sources EIA-860M · ERCOT

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • ERCOTOpen license · retrieved Nov 4, 2026