AES Huntington Beach Energy Project: location. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
AES Huntington Beach Energy Project
Power plant · Gas, combined cycle
Key facts
Power plant · Gas, combined cycleran 31% of 2025 Operating- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 2020
- Net generation, 2025
- 1,878,018 MWh
- Grid
- 230 kV to Southern California Edison Co (CISO)
- Location
- Orange County, California
- Operated by
- AES Huntington Beach Energy, LLC