AES Huntington Beach Energy Project — Power plant · Gas, combined cycle · AES Huntington Beach Energy, LLCSolar Photovoltaic Project #47 — Postponed · Solar · CA · 1 MW · 5.4 mi awayVS HR Warner NEM, LLC — Under construction · Solar · CA · 1 MW · 5.5 mi awaySanta Ana Storage 3 — Postponed · Storage · CA · 40 MW · 8.7 mi awayWestminster Reliability Project, LLC — Under construction · Storage · CA · 110 MW · 9.0 mi awayCobalt — Under construction · Solar + storage · CA · 250 MW · 12.6 mi away
  • Combustion
  • Wind & solar
  • Storage
  • Under construction
  • Operating
  • 10 · 100 · 1,000 MW

AES Huntington Beach Energy Project

Power plant · Gas, combined cycle

Key facts

Power plant · Gas, combined cycleran 31% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2020
Net generation, 2025
1,878,018 MWh
Grid
230 kV to Southern California Edison Co (CISO)
Location
Orange County, California

Output

Net generation MWh by year, 2020 to 2026
Fuel burned MMBtu by year, 2020 to 2026
  • Gas

Operations detail

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Gas, combined cycle source: “Natural Gas Fired Combined Cycle”
Age
6 years since 2020
Unused energy
4,247 GWh 2025Unused energyA lead, not a guarantee: MW × hours × (1 − capacity factor) for the latest year (EIA-923), gas, coal and oil plants only. Air-permit run-hour caps, heat rate (cost to run) and capacity-market or reliability obligations can rule it out.
Heat rate
6,912 Btu/kWh 2025
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Grid
Nerc region
WECC
Report year
2025
Grid voltage kv
230
Transmission owner
Southern California Edison Co
Balancing authority code
CISO
Balancing authority name
California Independent System Operator
Fuel burned (MMBtu), 202512,981,821
Capacity factor, 20250.307
Heat rate (Btu/kWh), 20256,912.5
Net generation (MWh), 20251,878,018
Balancing authority codeCISO

Ownership

2 companies3
Companies with an ownership or operating interest in this asset.
CompanyRoleShareAs ofSource
AES Huntington Beach Energy, LLC Operator EIA-860M
AES Huntington Beach Energy, LLC Owner 51.0% Dec 31, 2025 EIA-860
Ullico Infrastructure Southland Borrower LLC Owner 49.0% Dec 31, 2025 EIA-860

Timeline

  • In service · EIA-860M

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Solar Photovoltaic Project #47 Postponed Solar 5.4 mi 1
VS HR Warner NEM, LLC Under construction Solar 5.5 mi 1
Santa Ana Storage 3 Postponed Storage 8.7 mi 40
Westminster Reliability Project, LLC Under construction Storage 9.0 mi 110
Cobalt Under construction Solar + storage 12.6 mi 250

Sources EIA-860M · CAISO

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • CAISOOpen license, with credit · retrieved Nov 19, 2026Source: California ISO

Attribution