Show on map
Air Products Texas City — Power plant · Other · AIR PRODUCTS & CHEMICALS INCZeya — Under construction · Storage · TX · 255.3 MW · 2.9 mi awayRed Egret — Under construction · Storage · TX · 310.6 MW · 6.9 mi awayVertus Energy Storage Plant — Studied · Storage · TX · 204.9 MW · 8.4 mi awayHidden Lakes — Postponed · Storage · TX · 9.9 MW · 11.0 mi awayBerkman Storage — Postponed · Storage · TX · 100 MW · 13.7 mi away
  • Storage
  • Unspecified fuel
  • In development
  • Under construction
  • Operating
  • 10 · 100 · 1,000 MW

Air Products Texas City

Power plant · Other

Key facts

Power plant · Other Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2025
Grid
138 kV to Texas-New Mexico Power Co (ERCO)
Location
Galveston County, Texas
Operated by
Air Products & Chemicals IncSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2025

Operations detail

Details

Who’s behind it

Owner
Air Products & Chemicals IncSource100.0%, EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT), as of Dec 31, 2023

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Other source: “All Other”
Age
1 year since 2025
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Grid
Nerc region
TRE
Report year
2025
Grid voltage kv
138
Transmission owner
Texas-New Mexico Power Co
Balancing authority code
ERCO
Balancing authority name
Electric Reliability Council of Texas, Inc.
EPA greenhouse gas reporting (GHGRP)
EPA FRS ID
110071664886
Subparts reported
P
NAICS code
325311
Subpart PP (CO2 supply)
No
Subpart RR (geologic sequestration)
No
Subpart UU (CO2 injection)
No
Reporting year
2023
GHGRP facility ID
1014807
Fuel burned (MMBtu), 2025163,329
Capacity factor, 20250.084
Net generation (MWh), 202547,869
Balancing authority codeERCO

Timeline

  • In service · EIA-860M

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Zeya Under construction Storage 2.9 mi 255.3
Red Egret Under construction Storage 6.9 mi 310.6
Vertus Energy Storage Plant Studied Storage 8.4 mi 204.9
Hidden Lakes Postponed Storage 11.0 mi 9.9
Berkman Storage Postponed Storage 13.7 mi 100

Sources ERCOT · EIA-860M

Sources

  • ERCOTOpen license · retrieved Nov 4, 2026
  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution