Show on map
Airport 1 Solar (DIA) — Power plant · Solar · CleanCapital HoldingsCrusoe Brighton Buildout TI — Filed · Large load · CO · 7.1 mi awaySAMARITANS PURSE DATA CENTER — Built · Large load · CO · 10.1 mi awayPivot Solar 43 LLC — Under construction · Solar · CO · 3.5 MW · 10.4 mi awayPivot Solar 53 LLC — Under construction · Solar · CO · 4 MW · 10.4 mi awayDEN1-DC2 (Aurora data centre) — Filed · Large load · CO · 11.6 mi awayQTS AURORA LLC - QTS DEN1 — Built · Large load · CO · 11.7 mi awayJPMORGAN CHASE - PROJECT SYCAMORE AURORA — Built · Large load · CO · 12.2 mi awayAPA060 - Phase 5 MDC (Aurora data centre) — Built · Large load · CO · 13.0 mi awayAMAZON DATA SERVICES - DEN-22 — Built · Large load · CO · 13.3 mi away
  • Wind & solar
  • Loads
  • In development
  • Under construction
  • Operating
  • Size not stated
  • 10 · 100 · 1,000 MW

Airport 1 Solar (DIA)

Power plant · Solar

Key facts

Power plant · Solarran 12% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2009
Net generation, 2025
1,519 MWh
Grid
0.5 kV to Public Service Co of Colorado (SWPP)
Location
Adams County, Colorado
Operated by
CleanCapital HoldingsSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2014 to 2025

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Solar source: “Solar Photovoltaic”
Age
17 years since 2009
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Gem
Unit ids
G100000814393
Location id
L100000811824
Eia plant ids
59807
Grid
Nerc region
WECC
Report year
2025
Grid voltage kv
0.500
Transmission owner
Public Service Co of Colorado
Balancing authority code
SWPP
Balancing authority name
Southwest Power Pool
Fuel burned (MMBtu), 20255,182
Capacity factor, 20250.116
Net generation (MWh), 20251,519
Balancing authority codeSWPP

Solar array

Array area (acres)
9.6
AC capacity (MW)
1.5
DC capacity (MW)
1.6
Mounting
Fixed tilt
Site type
Greenfield
Began operating
2009

Source USPVDB

Source

  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb

Attribution

Timeline

  • In service · EIA-860M

Sources

5 sources

Sources EIA-860M · GEM · USPVDB · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
  • EIA-860M Preliminary Monthly Electric Generator Inventory

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Crusoe Brighton Buildout TI Filed Large load 7.1 mi
SAMARITANS PURSE DATA CENTER Built Large load 10.1 mi
Pivot Solar 43 LLC Under construction Solar 10.4 mi 3.5
Pivot Solar 53 LLC Under construction Solar 10.4 mi 4
DEN1-DC2 (Aurora data centre) Filed Large load 11.6 mi
QTS AURORA LLC - QTS DEN1 Built Large load 11.7 mi
JPMORGAN CHASE - PROJECT SYCAMORE AURORA Built Large load 12.2 mi
APA060 - Phase 5 MDC (Aurora data centre) Built Large load 13.0 mi
AMAZON DATA SERVICES - DEN-22 Built Large load 13.3 mi

Sources FAA OE/AAA · EPA ICIS-NPDES · EIA-860M · EPA ICIS-Air

Sources

Attribution