- Combustion
- Operating
- 10 · 100 · 1,000 MW
Map
- Combustion
- Operating
Alamosa: location. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Alamosa
Power plant · Gas, combustion turbine
Key facts
Power plant · Gas, combustion turbineran 6% of 2025 Retiring- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 1973
- Net generation, 2025
- 27,223 MWh
- Grid
- 115 kV, 69 kV to Public Service Co of Colorado (PSCO)
- Location
- Alamosa County, Colorado
- Operated by
- Public Service Co of ColoradoSourceEIA-860M Preliminary Monthly Electric Generator Inventory
Output
- Gas
- Oil
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Technology
- Gas, combustion turbine source: “Natural Gas Fired Combustion Turbine”
- Age
- 53 years since 1973
- Heat rate
- 19,488 Btu/kWh 2025
All 5 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| Fuel burned (MMBtu), 2025 | 530,514 |
| Capacity factor, 2025 | 0.058 |
| Heat rate (Btu/kWh), 2025 | 19,487.7 |
| Net generation (MWh), 2025 | 27,223 |
| Balancing authority code | PSCO |
Retirement
EIA-860M September 2026StatusAt least half of the plant's in-service nameplate capacity is scheduled to retire, on dates its owner has reported to EIA. As of EIA-860M for September 2026.- Next scheduled retirement
- December 2030
- Capacity scheduled to retire
- 53.2 MW
- Generators scheduled to retire
- 2
- Share of in-service capacity scheduled
- 100%
- Capacity still in service
- 53.2 MW
| Generator | Technology | Nameplate | State | Date |
|---|---|---|---|---|
| CT1 | Natural Gas Fired Combustion Turbine | 26.6 MW | Scheduled to retire | December 2030 |
| CT2 | Natural Gas Fired Combustion Turbine | 26.6 MW | Scheduled to retire | December 2030 |
Grid
EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).- Grid voltage at the plant
- 115 kV, 69 kV
- Transmission or distribution system owner
- Public Service Co of Colorado
- Balancing authority
- Public Service Company of Colorado
- NERC region
- WECC
Can the connection be reused?
A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.
Timeline
- Stated Units CT1, CT2 scheduled to retire, 53.2 MW · EIA-860M
- In service · EIA-860M
Sources
3 sourcesSources EIA-860M · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory
Sources
- EIA-860M
- EIASource: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EIA-860M Preliminary Monthly Electric Generator Inventory