Alliant SBD 9206 Donaldson — Power plant · Oil · Industrial Energy Applications Inc
  • Combustion
  • Operating
  • 10 · 100 · 1,000 MW

Alliant SBD 9206 Donaldson

Power plant · Oil

Key facts

Power plant · Oilran 0% of 2025 Standby
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1995
Net generation, 2025
7 MWh
Grid
0.5 kV to Interstate Power and Light Co (MISO)
Location
Howard County, Iowa
Operated by
Industrial Energy Applications IncSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Operations

Net generation, 2025
7MWh
Fuel burned, 2025
114MMBtu
Capacity factor, 2025
0.1%
Heat rate, 2025
16,618Btu/kWh
Capacity factor % of full output, by year
Heat rate Btu per kWh, by year
Net generation, fuel burned, capacity factor and heat rate by year, newest first, as EIA's bulk electricity file states them.
YearNet generation (MWh)Fuel burned (MMBtu)Capacity factorHeat rate (Btu/kWh)
202571140.1%16,618
20246900.0%15,306
20234590.0%15,051
20226960.0%16,326
2021192790.1%14,984
20203470.0%15,986
20195760.0%15,510
20186840.0%14,286
20170108——
201681200.1%15,306
2015072——
2014152250.1%15,000
2013355150.2%14,714
2012253770.2%15,080
2011152320.1%15,467
2010142140.1%15,286
2009142030.1%14,500
200891380.1%15,333
2007182620.1%14,556
2006242950.2%12,291
20054470.0%11,770
2004161900.1%11,875
2003293290.2%11,345
2002252830.2%11,320
How these are worked out

Net generation and fuel burned are the monthly figures EIA publishes in its bulk electricity file, from the plant's Form 923 reports; a year is the sum of its months. Capacity factor is a full year's net generation over today's nameplate capacity times the hours in that year (8,784 in a leap year), so a plant uprated or partly retired since reads against its current size; heat rate is fuel burned over net generation, for plants that burn fuel. A year with fewer than twelve months stated has no capacity factor, and a value outside the plausible range is left blank rather than shown. By month, the charts apply the same rules to each month's own hours and fuel.

Sources

2 sources

Sources EIA-860M · EIA

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)

Every source and license · Attribution

View at source