Alliant SBD 9302 Aegon NP — Power plant · Oil · Industrial Energy Applications Inc
  • Combustion
  • Retired
  • 10 · 100 · 1,000 MW

Alliant SBD 9302 Aegon NP

Power plant · Oil

Key facts

Power plant · Oilran 0% of 2021 Retired
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1995
Net generation, 2021
2 MWh
Grid
0.5 kV to Interstate Power and Light Co (MISO)
Location
Linn County, Iowa
Operated by
Industrial Energy Applications IncSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Operations

Net generation, 2021
2MWh
Fuel burned, 2021
24MMBtu
Capacity factor, 2021
0.0%
Heat rate, 2021
12,245Btu/kWh
Capacity factor % of full output, by year
Heat rate Btu per kWh, by year
Net generation, fuel burned, capacity factor and heat rate by year, newest first, as EIA's bulk electricity file states them.
YearNet generation (MWh)Fuel burned (MMBtu)Capacity factorHeat rate (Btu/kWh)
20212240.0%12,245
2020202960.2%15,102
20193410.0%13,946
20182290.0%14,796
2017072——
20163530.0%18,027
2015048——
20144650.0%16,250
20136960.1%16,000
2012192840.2%14,947
2011111670.1%15,182
20105720.1%14,400
20094590.0%14,750
20086900.1%15,000
2007223430.2%15,591
2006404580.4%11,450
20055650.1%12,936
20047810.1%11,571
2003171910.2%11,235
2002151690.1%11,267
How these are worked out

Net generation and fuel burned are the monthly figures EIA publishes in its bulk electricity file, from the plant's Form 923 reports; a year is the sum of its months. Capacity factor is a full year's net generation over today's nameplate capacity times the hours in that year (8,784 in a leap year), so a plant uprated or partly retired since reads against its current size; heat rate is fuel burned over net generation, for plants that burn fuel. A year with fewer than twelve months stated has no capacity factor, and a value outside the plausible range is left blank rather than shown. By month, the charts apply the same rules to each month's own hours and fuel.

Sources

2 sources

Sources EIA-860M · EIA

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)

Every source and license · Attribution

View at source