Show on map
Alta Loma 138 kV line — Transmission lineVertus Energy Storage Plant — Studied · Storage · TX · 204.9 MW · 3.1 mi awayRed Egret — Under construction · Storage · TX · 310.6 MW · 5.6 mi awayBerkman Storage — Postponed · Storage · TX · 100 MW · 7.5 mi awayHidden Lakes — Postponed · Storage · TX · 9.9 MW · 7.7 mi awayZeya — Under construction · Storage · TX · 255.3 MW · 8.6 mi awayBocanova Energy Storage II — Under construction · Storage · TX · 150 MW · 10.1 mi awayWillow Beach Wind — Contracted · Wind · TX · 202.3 MW · 10.1 mi awayCottonwood Bayou Solar — Built · Solar · TX · 351.4 MW · 13.4 mi awayBodkin BESS — Permitted · Storage · TX · 75 MW · 14.4 mi away
  • Wind & solar
  • Storage
  • In development
  • Under construction
  • Operating
  • Other infrastructure
  • 10 · 100 · 1,000 MW

Alta Loma 138 kV line

Transmission line

Mapped route length
Mapped route length: sourceLBNL · Open license, with creditmiles
Voltage
138 kV
States crossed
US-TX
Owner (as stated)
Centerpoint Energy Houston Electric

Details

Who’s behind it

Owner
Centerpoint Energy Houston Electric

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Mapped route length (miles)
0
Substations at the ends (as the source names them)
Alta Loma
All 3 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
Attributes
AttributeValue
Owner, as the source states itcenterpoint energy houston electric
HIFLD line ID310498
Voltage class100-161 kV

Sources

1 source

Sources LBNL

Sources

  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.

Every source and license · Attribution

View at source

Around this line

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Vertus Energy Storage Plant Studied Storage 3.1 mi 204.9
Red Egret Under construction Storage 5.6 mi 310.6
Berkman Storage Postponed Storage 7.5 mi 100
Hidden Lakes Postponed Storage 7.7 mi 9.9
Zeya Under construction Storage 8.6 mi 255.3
Bocanova Energy Storage II Under construction Storage 10.1 mi 150
Willow Beach Wind Contracted Wind 10.1 mi 202.3
Cottonwood Bayou Solar Built Solar 13.4 mi 351.4
Bodkin BESS Permitted Storage 14.4 mi 75

Sources EIA-860M · ERCOT

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • ERCOTOpen license · retrieved Nov 4, 2026

Attribution