Show on map
American Crystal Sugar Crookston — Power plant · Coal · AMERICAN CRYSTAL SUGAR CO
  • Combustion
  • Operating
  • 10 · 100 · 1,000 MW

American Crystal Sugar Crookston

Power plant · Coal

Key facts

Power plant · Coalran 72% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1954
Net generation, 2025
41,074 MWh
Grid
12 kV to Otter Tail Power Co (MISO)
Location
Polk County, Minnesota
Operated by
American Crystal Sugar COSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2002 to 2025
Fuel burned MMBtu by year, 2002 to 2025
  • Coal

Operations detail

Details

Who’s behind it

Owner
American Crystal Sugar COSource100.0%, EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT), as of Dec 31, 2023

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Coal source: “Conventional Steam Coal”
Age
72 years since 1954
Unused energy
16 GWh 2025Unused energyA lead, not a guarantee: MW × hours × (1 − capacity factor) for the latest year (EIA-923), gas, coal and oil plants only. Air-permit run-hour caps, heat rate (cost to run) and capacity-market or reliability obligations can rule it out.
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Grid
Nerc region
MRO
Report year
2025
Grid voltage kv
12.50
Transmission owner
Otter Tail Power Co
Balancing authority code
MISO
Balancing authority name
Midcontinent Independent Transmission System Operator, Inc..
EPA greenhouse gas reporting (GHGRP)
EPA FRS ID
110070273706
Subparts reported
C, S, TT
NAICS code
311313
Subpart PP (CO2 supply)
No
Subpart RR (geologic sequestration)
No
Subpart UU (CO2 injection)
No
CO2 captured
True
Reporting year
2023
GHGRP facility ID
1006354
Fuel burned (MMBtu), 20252,116,023
Capacity factor, 20250.721
Net generation (MWh), 202541,074
Balancing authority codeMISO
Data notes (1)
  • Heat rate (Btu/kWh), 2025 not shown: computed 51517.3 outside 5000-30000 Btu/kWh

Timeline

  • In service · EIA-860M