Show on map
American Crystal Sugar Moorhead — Power plant · Coal · AMERICAN CRYSTAL SUGAR CODatacenter Harwood — Filed · Large load · ND · 5.7 mi away
  • Combustion
  • Loads
  • In development
  • Operating
  • Size not stated
  • 10 · 100 · 1,000 MW

American Crystal Sugar Moorhead

Power plant · Coal

Key facts

Power plant · Coalran 86% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1948
Net generation, 2025
37,834 MWh
Grid
12 kV to City of Moorhead - (MN) (SWPP)
Location
Clay County, Minnesota
Operated by
American Crystal Sugar COSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2002 to 2025
Fuel burned MMBtu by year, 2002 to 2025
  • Coal

Operations detail

Details

Who’s behind it

Owner
American Crystal Sugar COSource100.0%, EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT), as of Dec 31, 2023

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Coal source: “Conventional Steam Coal”
Age
78 years since 1948
Unused energy
6 GWh 2025Unused energyA lead, not a guarantee: MW × hours × (1 − capacity factor) for the latest year (EIA-923), gas, coal and oil plants only. Air-permit run-hour caps, heat rate (cost to run) and capacity-market or reliability obligations can rule it out.
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Grid
Nerc region
MRO
Report year
2025
Grid voltage kv
12.50
Transmission owner
City of Moorhead - (MN)
Balancing authority code
SWPP
Balancing authority name
Southwest Power Pool
EPA greenhouse gas reporting (GHGRP)
EPA FRS ID
110000427440
Subparts reported
C, S, TT
NAICS code
311313
Subpart PP (CO2 supply)
No
Subpart RR (geologic sequestration)
No
Subpart UU (CO2 injection)
No
CO2 captured
True
Reporting year
2023
GHGRP facility ID
1006877
Fuel burned (MMBtu), 20252,043,742
Capacity factor, 20250.864
Net generation (MWh), 202537,834
Balancing authority codeSWPP
Data notes (1)
  • Heat rate (Btu/kWh), 2025 not shown: computed 54018.7 outside 5000-30000 Btu/kWh

Timeline

  • In service · EIA-860M

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Datacenter Harwood Filed Large load 5.7 mi

Sources FAA OE/AAA

Sources

  • FAA OE/AAAOpen license · retrieved Nov 16, 2026

Attribution