Show on map
ANAD Solar Array — Power plant · Solar · Alabama Power CoDega Solar and Storage — Solar + storage · AL · 400 MW · 14.7 km away
  • Wind & solar
  • In development
  • Operating
  • 10 · 100 · 1,000 MW

ANAD Solar Array

Power plant · Solar

Key facts

Power plant · Solarran 20% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2017
Net generation, 2025
12,752 MWh
Grid
12 kV to Alabama Power Co (SOCO)
Location
Calhoun County, Alabama
Operated by
Alabama Power CoSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2017 to 2025

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Solar source: “Solar Photovoltaic”
Age
9 years since 2017
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Gem
Unit ids
G100000814448
Location id
L100000811877
Eia plant ids
60680
Grid
Nerc region
SERC
Report year
2025
Grid voltage kv
12.50
Transmission owner
Alabama Power Co
Balancing authority code
SOCO
Balancing authority name
Southern Company Services, Inc. - Trans
Fuel burned (MMBtu), 202543,511
Capacity factor, 20250.197
Net generation (MWh), 202512,752
Balancing authority codeSOCO

Solar arrays

Array area (acres)
9.8
AC capacity (MW)
7.4
DC capacity (MW)
9.7
Mounting
Fixed tilt
Site type
Greenfield
Began operating
2017

Source USPVDB

Source

  • U.S. Large-Scale Solar Photovoltaic DatabaseOpen license · retrieved 25 Oct 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb

Attribution

Timeline

  • In service · EIA-860M

Sources

5 sources

Sources EIA-860M · GEM · USPVDB · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
Dega Solar and Storage Filed Solar + storage 14.7 km 400

Sources EIA-860M

Sources

Attribution