Anderson - Central Tie 230 kV — Transmission lineIWS ANDERSON DATA CENTER PROJECT PHASE 2 — Under construction · Large load · SC · 0.2 mi awaySnoopy Solar — Postponed · Solar · SC · 2 MW · 1.6 mi awayTarpon Solar I — Postponed · Solar · SC · 2 MW · 2.2 mi awayIndigo Solar — Postponed · Solar · SC · 2 MW · 7.9 mi awayJohn S Rainey — Postponed · Gas, combined cycle · SC · 530 MW · 8.1 mi awayWebster Solar — Postponed · Solar · SC · 5.4 MW · 13.1 mi away
  • Loads
  • Under construction
  • Size not stated
  • Other infrastructure
  • 10 · 100 · 1,000 MW

Anderson - Central Tie 230 kV

Transmission line

Mapped route length
Mapped route length: sourceLBNL · Open license, with creditmiles
Voltage
230 kV
States crossed
US-SC
Owner (as stated)
Duke Energy Carolinas

Details

Who’s behind it

Owner
Duke Energy Carolinas

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Mapped route length (miles)
23
Substations at the ends (as the source names them)
Anderson to Central Tie
All 3 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
Attributes
AttributeValue
Owner, as the source states itduke energy carolinas
HIFLD line ID117913
Voltage class220-287 kV

Sources

1 source

Sources LBNL

Sources

  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.

Every source and license · Attribution

View at source

Around this line

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
IWS ANDERSON DATA CENTER PROJECT PHASE 2 Under construction Large load 0.2 mi
Snoopy Solar Postponed Solar 1.6 mi 2
Tarpon Solar I Postponed Solar 2.2 mi 2
Indigo Solar Postponed Solar 7.9 mi 2
John S Rainey Postponed Gas, combined cycle 8.1 mi 530
Webster Solar Postponed Solar 13.1 mi 5.4