Angleton: location and 13 exact-grade projects within 25 km. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Angleton
Power plant · Storage
Key facts
Power plant · Storage Operating- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 2020
- Net generation, 2025
- -542 MWh
- Grid
- 12 kV to Texas-New Mexico Power Co (ERCO)
- Location
- Brazoria County, Texas
- Operated by
- ENGIE North AmericaSourceEIA-860M Preliminary Monthly Electric Generator Inventory
Output
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Technology
- Storage source: “Batteries”
- Age
- 6 years since 2020
All 4 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| Grid |
|
| Fuel burned (MMBtu), 2025 | 0 |
| Net generation (MWh), 2025 | -542 |
| Balancing authority code | ERCO |
Data notes (1)
- Capacity factor, 2025 not shown: net generation -542.0 MWh is not positive (the plant consumed at least as much as it produced over the year)
Timeline
- In service · EIA-860M
Sources
3 sourcesSources EIA-860M · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory
Sources
- EIA-860M Preliminary Monthly Electric Generator Inventory
- EIA Open Data bulk file — Electricity (ELEC.zip; monthly plant net generation and fuel consumption since 2001)Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EIA-860M Preliminary Monthly Electric Generator Inventory
Around this plant
Nearby
within 25 km| Project | Kind | Away | MW |
|---|---|---|---|
| Windmill Ridge Storage Postponed | Storage | 4.7 km | 151.4 |
| Myrtle Solar, LLC Under construction | Solar | 6.9 km | 313 |
| Brazoria Solar I Under construction | Solar | 7.5 km | 250 |
| Cradle Solar Postponed | Solar | 14.3 km | 225 |
| Rock N' Roll Studied | Solar + storage | 14.8 km | 358 |
| Brazos River BESS LLC Contracted | Storage | 17.6 km | 180.4 |
| Nash Solar Under construction | Solar | 17.9 km | 10 |
| Bodkin BESS Permitted | Storage | 19.4 km | 75 |
| Freeport Energy Center Postponed | Gas, combined cycle | 20.3 km | 180 |
| Castor Under construction | Storage | 20.5 km | 200 |
| Cottonwood Bayou Solar Built | Solar | 20.7 km | 351.4 |
| TX17 Nickel Prairie Storage Postponed | Storage | 20.8 km | 100 |
| Bell Creek BESS LLC Contracted | Storage | 22.3 km | 200.9 |