Angleton — Power plant · Storage · ENGIE North AmericaWindmill Ridge Storage — Storage · TX · 151.4 MW · 4.7 km awayMyrtle Solar, LLC — Solar · TX · 313 MW · 6.9 km awayBrazoria Solar I — Solar · TX · 250 MW · 7.5 km awayCradle Solar — Solar · TX · 225 MW · 14.3 km awayRock N' Roll — Solar + storage · TX · 358 MW · 14.8 km awayBrazos River BESS LLC — Storage · TX · 180.4 MW · 17.6 km awayNash Solar — Solar · TX · 10 MW · 17.9 km awayBodkin BESS — Storage · TX · 75 MW · 19.4 km awayFreeport Energy Center — Gas, combined cycle · TX · 180 MW · 20.3 km awayCastor — Storage · TX · 200 MW · 20.5 km awayCottonwood Bayou Solar — Solar · TX · 351.4 MW · 20.7 km awayTX17 Nickel Prairie Storage — Storage · TX · 100 MW · 20.8 km awayBell Creek BESS LLC — Storage · TX · 200.9 MW · 22.3 km away
  • Wind & solar
  • Storage
  • In development
  • Under construction
  • Operating
  • 10 · 100 · 1,000 MW

Power plant · Storage

Key facts

Power plant · Storage Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2020
Net generation, 2025
-542 MWh
Grid
12 kV to Texas-New Mexico Power Co (ERCO)
Location
Brazoria County, Texas
Operated by
ENGIE North AmericaSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2020 to 2025

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Storage source: “Batteries”
Age
6 years since 2020
All 4 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Grid
Nerc region
TRE
Report year
2025
Grid voltage kv
12.50
Transmission owner
Texas-New Mexico Power Co
Balancing authority code
ERCO
Balancing authority name
Electric Reliability Council of Texas, Inc.
Fuel burned (MMBtu), 20250
Net generation (MWh), 2025-542
Balancing authority codeERCO
Data notes (1)
  • Capacity factor, 2025 not shown: net generation -542.0 MWh is not positive (the plant consumed at least as much as it produced over the year)

Timeline

  • In service · EIA-860M

Sources

3 sources

View at source

Around this plant

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
Windmill Ridge Storage Postponed Storage 4.7 km 151.4
Myrtle Solar, LLC Under construction Solar 6.9 km 313
Brazoria Solar I Under construction Solar 7.5 km 250
Cradle Solar Postponed Solar 14.3 km 225
Rock N' Roll Studied Solar + storage 14.8 km 358
Brazos River BESS LLC Contracted Storage 17.6 km 180.4
Nash Solar Under construction Solar 17.9 km 10
Bodkin BESS Permitted Storage 19.4 km 75
Freeport Energy Center Postponed Gas, combined cycle 20.3 km 180
Castor Under construction Storage 20.5 km 200
Cottonwood Bayou Solar Built Solar 20.7 km 351.4
TX17 Nickel Prairie Storage Postponed Storage 20.8 km 100
Bell Creek BESS LLC Contracted Storage 22.3 km 200.9

Sources EIA-860M · ERCOT

Sources

Attribution