Angoon — Power plant · Oil · Inside Passage Elec Coop, Inc
  • Combustion
  • Operating
  • 10 · 100 · 1,000 MW

Power plant · Oil

Key facts

Power plant · Oilran 14% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1990
Net generation, 2025
1,904 MWh
Grid
12 kV to Inside Passage Elec Coop, Inc
Location
Skagway Hoonah Angoon County, Alaska
Operated by
Inside Passage Elec Coop, IncSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Operations

Net generation, 2025
1,904MWh
Fuel burned, 2025
19,023MMBtu
Capacity factor, 2025
14.5%
Heat rate, 2025
9,991Btu/kWh
Capacity factor % of full output, by year
Heat rate Btu per kWh, by year
Net generation, fuel burned, capacity factor and heat rate by year, newest first, as EIA's bulk electricity file states them.
YearNet generation (MWh)Fuel burned (MMBtu)Capacity factorHeat rate (Btu/kWh)
20251,90419,02314.5%9,991
20241,78725,17313.6%14,087
20231,81623,41013.8%12,891
20221,78121,47813.6%12,060
20211,74217,91013.3%10,281
20201,64216,50712.5%10,053
20191,61216,29912.3%10,111
20181,65317,54412.6%10,613
20171,67517,06012.8%10,185
20161,71417,44813.0%10,180
20151,67717,61412.8%10,503
20141,69318,29912.9%10,809
20131,70318,39113.0%10,799
20121,76518,00813.4%10,203
20111,97919,47615.1%9,841
20101,92819,79814.7%10,269
20091,87319,78214.2%10,562
20081,81420,44213.8%11,269
20071,83120,16613.9%11,014
20061,87121,21114.2%11,337
20051,89920,66014.4%10,879
20041,95821,15914.9%10,806
20031,93720,96714.7%10,824
20021,99620,98215.2%10,512
How these are worked out

Net generation and fuel burned are the monthly figures EIA publishes in its bulk electricity file, from the plant's Form 923 reports; a year is the sum of its months. Capacity factor is a full year's net generation over today's nameplate capacity times the hours in that year (8,784 in a leap year), so a plant uprated or partly retired since reads against its current size; heat rate is fuel burned over net generation, for plants that burn fuel. A year with fewer than twelve months stated has no capacity factor, and a value outside the plausible range is left blank rather than shown. By month, the charts apply the same rules to each month's own hours and fuel.

Sources

2 sources

Sources EIA-860M · EIA

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)

Every source and license · Attribution

View at source