Show on map
Anheuser-Busch Baldwinsville — Power plant · Solar · AES Distributed EnergyWest Genesee — Under construction · Solar · NY · 2.9 MW · 1.0 mi awayLysander III PV — Under construction · Solar · NY · 2.4 MW · 4.9 mi awayCold Springs — Under construction · Solar · NY · 5 MW · 7.0 mi awaySunEast Clay Solar Project — Postponed · Solar · NY · 50 MW · 12.5 mi away
  • Wind & solar
  • Under construction
  • Operating
  • 10 · 100 · 1,000 MW

Anheuser-Busch Baldwinsville

Power plant · Solar

Key facts

Power plant · Solarran 14% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2018
Net generation, 2025
2,458 MWh
Grid
13 kV to Niagara Mohawk Power Corp. (NYIS)
Location
Onondaga County, New York

Output

Net generation MWh by year, 2018 to 2025

Operations detail

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Solar source: “Solar Photovoltaic”
Age
8 years since 2018
All 7 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Gem
Unit ids
G100000814465
Location id
L100000811890
Eia plant ids
61575
Grid
Nerc region
NPCC
Report year
2025
Grid voltage kv
13.20
Transmission owner
Niagara Mohawk Power Corp.
Balancing authority code
NYIS
Balancing authority name
New York Independent System Operator
EPA greenhouse gas reporting (GHGRP)
EPA FRS ID
110027254986
NAICS code
424710
Subpart PP (CO2 supply)
No
Subpart RR (geologic sequestration)
No
Subpart UU (CO2 injection)
No
Reporting year
2023
GHGRP facility ID
1011577
Fuel burned (MMBtu), 20258,387
Capacity factor, 20250.140
Net generation (MWh), 20252,458
Balancing authority codeNYIS

Solar array

Array area (acres)
9.6
AC capacity (MW)
2
DC capacity (MW)
2.8
Mounting
Fixed tilt
Site type
Greenfield
Began operating
2018

Source USPVDB

Source

  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb

Attribution

Ownership

2 companies2
Companies with an ownership or operating interest in this asset.
CompanyRoleShareAs ofSource
AES Distributed Energy Operator EIA-860M
Seaboard Energy, LLC Owner 100.0% Dec 31, 2023 EPA GHGRP

Timeline

  • In service · EIA-860M

Sources

6 sources

Sources EIA-860M · GEM · USPVDB · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory · EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT)

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
  • EIA-860M Preliminary Monthly Electric Generator Inventory
  • EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT)

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
West Genesee Under construction Solar 1.0 mi 2.9
Lysander III PV Under construction Solar 4.9 mi 2.4
Cold Springs Under construction Solar 7.0 mi 5
SunEast Clay Solar Project Postponed Solar 12.5 mi 50

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution