Archer Daniels Midland Clinton

Power plant · Coal

Key facts

Power plant · Coalran 45% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2009
Net generation, 2025
716,358 MWh
Grid
69 kV to Interstate Power and Light Co (MISO)
Location
Clinton County, Iowa
Operated by
Archer Daniels MidlandSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2002 to 2026
Fuel burned MMBtu by year, 2002 to 2026
  • Gas
  • Coal
  • Oil
  • Biomass and waste

Operations detail

Details

Who’s behind it

Owner
Archer Daniels MidlandSource100.0%, EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT), as of Dec 31, 2023

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Coal source: “Conventional Steam Coal”
Age
17 years since 2009
Unused energy
860 GWh 2025Unused energyA lead, not a guarantee: MW × hours × (1 − capacity factor) for the latest year (EIA-923), gas, coal and oil plants only. Air-permit run-hour caps, heat rate (cost to run) and capacity-market or reliability obligations can rule it out.
Heat rate
25,688 Btu/kWh 2025
All 7 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Gem
Parents
Name
Archer-Daniels-Midland Co
Share pct
100
Gem entity id
E100001000641
Unit ids
G100000100320, G100000100321
Location id
L100000103904
EPA greenhouse gas reporting (GHGRP)
EPA FRS ID
110000415630
Subparts reported
C, TT
NAICS code
311221
Subpart PP (CO2 supply)
No
Subpart RR (geologic sequestration)
No
Subpart UU (CO2 injection)
No
Reporting year
2023
GHGRP facility ID
1006208
Fuel burned (MMBtu), 202518,402,086
Capacity factor, 20250.454
Heat rate (Btu/kWh), 202525,688.4
Net generation (MWh), 2025716,358
Balancing authority codeMISO

Retirement

EIA-860M September 2026StatusSome generators have retired; the rest of the plant is still in service. As of EIA-860M for September 2026.
Capacity retired
31.4 MW
Generators retired
5
Capacity still in service
180 MW
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
GEN1Conventional Steam Coal7.5 MWRetiredOctober 2008
GEN2Conventional Steam Coal3.5 MWRetiredOctober 2008
GEN3Conventional Steam Coal9.4 MWRetiredOctober 2008
GEN4Conventional Steam Coal4 MWRetiredOctober 2008
GEN5Conventional Steam Coal7 MWRetiredOctober 2008

Grid

EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).
Grid voltage at the plant
69 kV
Transmission or distribution system owner
Interstate Power and Light Co
Balancing authority
Midcontinent Independent Transmission System Operator, Inc..
NERC region
MRO
Transmission lines within 15 mi (10)
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Timeline

  • In service · EIA-860M
  • Stated Units GEN1, GEN2, GEN3, GEN4, GEN5 scheduled to retire, 31.4 MW · EIA-860M

Sources

6 sources

Sources EIA-860M · GEM · LBNL · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory · EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT)

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
  • EIA-860M Preliminary Monthly Electric Generator Inventory
  • EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT)

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Rock Creek Solar Under construction Solar 8.3 mi 150

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution