Archer Daniels Midland Taylorville — Power plant · Gas, combustion turbine · Archer Daniels MidlandTaylorville Energy Center — Postponed · Coal · IL · 760 MW · 2.0 mi awayPrairie Oak Solar — Announced · Solar · IL · 250 MW · 14.8 mi awayLincoln Land Energy Center — Announced · Gas, combined cycle · IL · 1,276.8 MW · 15.0 mi away
  • Combustion
  • Wind & solar
  • In development
  • Retired
  • 10 · 100 · 1,000 MW

Archer Daniels Midland Taylorville

Power plant · Gas, combustion turbine

Key facts

Power plant · Gas, combustion turbine Retired
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1994
Location
Christian County, Illinois
Operated by
Archer Daniels MidlandSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Gas, combustion turbine source: “Natural Gas Fired Combustion Turbine”
Age
32 years since 1994

Retirement

EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.
Retired
January 2003
Capacity retired
4.6 MW
Generators retired
1
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
GEN1Natural Gas Fired Combustion Turbine4.6 MWRetiredJanuary 2003

Grid

EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).
NERC region
SERC
Transmission lines within 15 mi (10)
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Timeline

  • Stated Unit GEN1 scheduled to retire, 4.6 MW · EIA-860M
  • In service · EIA-860M

Sources

3 sources

Sources EIA-860M · LBNL · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Taylorville Energy Center Postponed Coal 2.0 mi 760
Prairie Oak Solar Announced Solar 14.8 mi 250
Lincoln Land Energy Center Announced Gas, combined cycle 15.0 mi 1,276.8