Show on map
Arctic LNG 2 Terminal power station — Power plant · Gas, reciprocating engine · Arctic LNG 2 LLCArctic LNG 2 Terminal power station Phase 2 (Beregovaya GTES) — Under construction · Gas, reciprocating engine · Russia · 500 MW · 0.0 km away
  • Combustion
  • Under construction
  • Operating
  • 10 · 100 · 1,000 MW

Arctic LNG 2 Terminal power station

Power plant · Gas, reciprocating engine

Key facts

Power plant · Gas, reciprocating engine Operating
Capacity
Capacity: sourceGlobal Energy Monitor — Global Integrated Power Tracker (unit-level power plants, eight technologies, all statuses) · Open license, with creditMW
Commissioned
2025
Location
Yamal-Nenets, Russia
Operated by
Arctic LNG 2 LLCSourceGlobal Energy Monitor — Global Integrated Power Tracker (unit-level power plants, eight technologies, all statuses)

Details

Who’s behind it

Owner
Arctic LNG 2 LLCSource100.0%, Global Energy Monitor — Global Integrated Power Tracker (unit-level power plants, eight technologies, all statuses)

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Gas, reciprocating engine source: “oil/gas / internal combustion”
Age
1 year since 2025
Units
2
1 attribute from Global Energy Monitor — Global Integrated Power Tracker (unit-level power plants, eight technologies, all statuses)
Attributes
AttributeValue
Gem
Owners
Name
Arctic LNG 2 LLC
Share pct
100
Gem entity id
E100002004816
Parents
Name
Novatek PJSC
Share pct
60
Gem entity id
E100000152472
Name
China National Petroleum Corp
Share pct
10
Gem entity id
E100000180733
Name
CNOOC Ltd
Share pct
10
Gem entity id
E100001014354
Name
TotalEnergies SE
Share pct
10
Gem entity id
E100000000387
Name
Japan Organization for Metals and Energy Security
Share pct
7.50
Gem entity id
E100001010156
Name
Mitsui & Co Ltd
Share pct
2.50
Gem entity id
E100000000651
Unit ids
G100001070617, G100001070621
Location id
L100001061607
Subnational
Yamal-Nenets
Unit statuses
Operating
2
Location accuracy
exact

Timeline

  • In service · GEM

Sources

2 sources

Sources GEM · Global Energy Monitor — Global Integrated Power Tracker (unit-level power plants, eight technologies, all statuses)

Sources

  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
  • Global Energy Monitor — Global Integrated Power Tracker (unit-level power plants, eight technologies, all statuses)

Every source and license · Attribution

View at source

Around this plant

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
Arctic LNG 2 Terminal power station Phase 2 (Beregovaya GTES) Under construction Gas, reciprocating engine 0.0 km 500

Sources GEM

Sources

  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.

Attribution