Argonne National Laboratory CHP — Power plant · Gas, combustion turbine · Argonne National LaboratoryInternationale Ctr 11-SLCHI321 — Under construction · Solar · IL · 1.8 MW · 3.1 mi awayIL - SMHEC - Moraine Valley — Postponed · Solar · IL · 1.3 MW · 7.3 mi awayENSONO DATA CENTER — Built · Large load · IL · 8.1 mi awayCLEARBLUE TECHNOLOGIES/OAKBROOK INC — Built · Large load · IL · 9.0 mi awayAC IL - Lockport East — Under construction · Solar · IL · 3.1 MW · 9.0 mi away360 TCS LLC — Built · Large load · IL · 9.1 mi awayAC IL - Lockport West — Under construction · Solar · IL · 3.4 MW · 9.7 mi awayMcCook 2-SLCHI102 — Under construction · Solar · IL · 2 MW · 9.8 mi awayRomeoville 34 - SLCHI234 - BSCHI234 — Under construction · Storage · IL · 0.5 MW · 11.0 mi awayMERIDIAN PARKWAY DATA CENTER OWNER LLC — Built · Large load · IL · 13.3 mi awayNorthlake 2-SLCHI302 — Under construction · Solar · IL · 1.6 MW · 13.9 mi awayAligned (Northlake data centre) — Built · Large load · IL · 13.9 mi awayNorthlake 3-SLCHI303 — Under construction · Solar · IL · 1.6 MW · 14.3 mi awayNALCO WATER — Built · Large load · IL · 14.4 mi awayNorthlake 4-SLCHI304 — Under construction · Solar · IL · 1.4 MW · 14.5 mi awayRobbins Community Power LLC — Postponed · Biomass · IL · 55 MW · 14.6 mi awayMICROSOFT CORP-CHICAGO DATA CENTER — Built · Large load · IL · 14.8 mi awayNorthlake 5-SLCHI305 — Under construction · Solar · IL · 2.5 MW · 14.9 mi away
  • Combustion
  • Wind & solar
  • Storage
  • Loads
  • Under construction
  • Operating
  • Size not stated
  • 10 · 100 · 1,000 MW

Argonne National Laboratory CHP

Power plant · Gas, combustion turbine

Key facts

Power plant · Gas, combustion turbineran 73% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2016
Net generation, 2025
40,296 MWh
Grid
138 kV to Commonwealth Edison Co (PJM)
Location
DuPage County, Illinois
Operated by
Argonne National LaboratorySourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2016 to 2025
Fuel burned MMBtu by year, 2016 to 2025
  • Gas

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Gas, combustion turbine source: “Natural Gas Fired Combustion Turbine”
Age
10 years since 2016
Unused energy
15 GWh 2025Unused energyA lead, not a guarantee: MW × hours × (1 − capacity factor) for the latest year (EIA-923), gas, coal and oil plants only. Air-permit run-hour caps, heat rate (cost to run) and capacity-market or reliability obligations can rule it out.
Heat rate
11,696 Btu/kWh 2025
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Grid
Nerc region
RFC
Report year
2025
Grid voltage kv
138
Transmission owner
Commonwealth Edison Co
Balancing authority code
PJM
Balancing authority name
PJM Interconnection, LLC
Fuel burned (MMBtu), 2025471,302
Capacity factor, 20250.730
Heat rate (Btu/kWh), 202511,696
Net generation (MWh), 202540,296
Balancing authority codePJM

Timeline

  • In service · EIA-860M

Sources

3 sources

Sources EIA-860M · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Internationale Ctr 11-SLCHI321 Under construction Solar 3.1 mi 1.8
IL - SMHEC - Moraine Valley Postponed Solar 7.3 mi 1.3
ENSONO DATA CENTER Built Large load 8.1 mi
CLEARBLUE TECHNOLOGIES/OAKBROOK INC Built Large load 9.0 mi
AC IL - Lockport East Under construction Solar 9.0 mi 3.1
360 TCS LLC Built Large load 9.1 mi
AC IL - Lockport West Under construction Solar 9.7 mi 3.4
McCook 2-SLCHI102 Under construction Solar 9.8 mi 2
Romeoville 34 - SLCHI234 - BSCHI234 Under construction Storage 11.0 mi 0.5
MERIDIAN PARKWAY DATA CENTER OWNER LLC Built Large load 13.3 mi
Northlake 2-SLCHI302 Under construction Solar 13.9 mi 1.6
Aligned (Northlake data centre) Built Large load 13.9 mi
Northlake 3-SLCHI303 Under construction Solar 14.3 mi 1.6
NALCO WATER Built Large load 14.4 mi
Northlake 4-SLCHI304 Under construction Solar 14.5 mi 1.4
Robbins Community Power LLC Postponed Biomass 14.6 mi 55
MICROSOFT CORP-CHICAGO DATA CENTER Built Large load 14.8 mi
Northlake 5-SLCHI305 Under construction Solar 14.9 mi 2.5

Sources EIA-860M · EPA ICIS-Air · FAA OE/AAA · EPA ICIS-NPDES

Sources

Attribution