Arlington Energy Center III: location. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Arlington Energy Center III
Power plant · Solar
Key facts
Power plant · Solarran 15% of 2025 Operating- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 2022
- Net generation, 2025
- 320,920 MWh
- Grid
- 220 kV to Southern California Edison Co (CISO)
- Location
- Riverside County, California
- Operated by
- Arlington Energy Center IIISourceEIA-860M Preliminary Monthly Electric Generator Inventory
Operations
- Net generation, 2025
- 320,920
MWh - Fuel burned, 2025
- 1,161,749
MMBtu - Capacity factor, 2025
- 15.2
% - Heat rate, 2025
- Not stated
| Year | Net generation (MWh) | Fuel burned (MMBtu) | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|---|
| 2026 (8 of 12 months) | 238,421 | 863,824 | — | — |
| 2025 | 320,920 | 1,161,749 | 15.2% | — |
| 2024 | 273,897 | 1,016,588 | 12.9% | — |
| 2023 | 290,149 | 1,051,395 | 13.7% | — |
| 2022 (5 of 12 months) | 118,576 | 422,303 | — | — |
How these are worked out
Net generation and fuel burned are the monthly figures EIA publishes in its bulk electricity file, from the plant's Form 923 reports; a year is the sum of its months. Capacity factor is a full year's net generation over today's nameplate capacity times the hours in that year (8,784 in a leap year), so a plant uprated or partly retired since reads against its current size; heat rate is fuel burned over net generation, for plants that burn fuel. A year with fewer than twelve months stated has no capacity factor, and a value outside the plausible range is left blank rather than shown. By month, the charts apply the same rules to each month's own hours and fuel.