Show on map
Ashland — Power plant · Oil · City of Ashland - (KS)
  • Combustion
  • Operating
  • 10 · 100 · 1,000 MW

Power plant · Oil

Key facts

Power plant · Oilran 0% of 2025 Standby
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1953
Net generation, 2025
32 MWh
Grid
34 kV to City of Ashland - (KS) (SWPP)
Location
Clark County, Kansas
Operated by
City of Ashland - (KS)SourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2001 to 2025
Fuel burned MMBtu by year, 2001 to 2025
  • Gas
  • Oil

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Oil source: “Petroleum Liquids”
Age
73 years since 1953
Heat rate
5,562 Btu/kWh 2025
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Eia status
By code
SB
Mw
5.60
Units
5
Standby mw
5.60
Status rule
majority_mw_standby
In service mw
5.60
Out of service mw
0
Fuel burned (MMBtu), 2025178
Capacity factor, 20250.001
Heat rate (Btu/kWh), 20255,562.5
Net generation (MWh), 202532
Balancing authority codeSWPP

Retirement

Capacity retired
1.2 MW
Generators retired
1
Capacity still in service
5.6 MW
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
4Petroleum Liquids1.2 MWRetiredJanuary 2014

Grid

EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).
Grid voltage at the plant
34 kV
Transmission or distribution system owner
City of Ashland - (KS)
Balancing authority
Southwest Power Pool
NERC region
MRO
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Timeline

  • Stated Unit 4 scheduled to retire, 1.2 MW · EIA-860M
  • In service · EIA-860M

Sources

3 sources

Sources EIA-860M · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

Every source and license · Attribution

View at source