Show on map
Ashtabula — Power plant · Gas, combined cycle · DTE Ashtabula, LLC
  • Combustion
  • Operating
  • 10 · 100 · 1,000 MW

Power plant · Gas, combined cycle

Key facts

Power plant · Gas, combined cycleran 73% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2001
Net generation, 2025
167,205 MWh
Grid
138 kV to Cleveland Electric Illum Co (PJM)
Location
Ashtabula County, Ohio
Operated by
DTE Ashtabula, LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2004 to 2026
Fuel burned MMBtu by year, 2004 to 2026
  • Gas

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Gas, combined cycle source: “Natural Gas Fired Combined Cycle”
Age
25 years since 2001
Unused energy
61 GWh 2025Unused energyA lead, not a guarantee: MW × hours × (1 − capacity factor) for the latest year (EIA-923), gas, coal and oil plants only. Air-permit run-hour caps, heat rate (cost to run) and capacity-market or reliability obligations can rule it out.
Heat rate
18,508 Btu/kWh 2025
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Grid
Nerc region
RFC
Report year
2025
Grid voltage kv
138
Transmission owner
Cleveland Electric Illum Co
Balancing authority code
PJM
Balancing authority name
PJM Interconnection, LLC
Fuel burned (MMBtu), 20253,094,566
Capacity factor, 20250.731
Heat rate (Btu/kWh), 202518,507.6
Net generation (MWh), 2025167,205
Balancing authority codePJM

Timeline

  • In service · EIA-860M

Sources

3 sources

View at source