Show on map
Aspiration G — Power plant · Solar · AES Distributed EnergyGiffen — Withdrawn · Solar · CA · 10 MW · 2.5 mi awayEDPR Scarlet III — Under construction · Storage · CA · 70 MW · 3.9 mi awayEDPR CA Solar Park VI LLC (CA) Hybrid — Under construction · Solar + storage · CA · 241 MW · 5.3 mi awayDarden I Solar — Contracted · Solar + storage · CA · 1,150 MW · 8.2 mi awayLittle Bear Solar 2, LLC — Contracted · Solar + storage · CA · 20 MW · 11.8 mi awayHelms Energy Center — Postponed · Gas, combustion turbine · CA · 48 MW · 13.4 mi awayIron BESS — Under construction · Storage · CA · 59.5 MW · 14.3 mi awayMidway BESS — Under construction · Storage · CA · 124.6 MW · 14.3 mi away
  • Wind & solar
  • Storage
  • In development
  • Under construction
  • Operating
  • 10 · 100 · 1,000 MW

Aspiration G

Power plant · Solar

Key facts

Power plant · Solarran 27% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2017
Net generation, 2025
21,120 MWh
Grid
12 kV to Southern California Edison Co (CISO)
Location
Fresno County, California
Operated by
AES Distributed EnergySourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2017 to 2025

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Solar source: “Solar Photovoltaic”
Age
9 years since 2017
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Gem
Unit ids
G100000814537
Location id
L100000811950
Eia plant ids
59737
Grid
Nerc region
WECC
Report year
2025
Grid voltage kv
12
Transmission owner
Southern California Edison Co
Balancing authority code
CISO
Balancing authority name
California Independent System Operator
Fuel burned (MMBtu), 202572,060
Capacity factor, 20250.268
Net generation (MWh), 202521,120
Balancing authority codeCISO

Solar array

Array area (acres)
59.2
AC capacity (MW)
9
DC capacity (MW)
11.7
Mounting
Single-axis tracking
Site type
Greenfield
Began operating
2017

Source USPVDB

Source

  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb

Attribution

Timeline

  • In service · EIA-860M

Sources

5 sources

Sources EIA-860M · GEM · USPVDB · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
  • EIA-860M Preliminary Monthly Electric Generator Inventory

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Giffen Withdrawn Solar 2.5 mi 10
EDPR Scarlet III Under construction Storage 3.9 mi 70
EDPR CA Solar Park VI LLC (CA) Hybrid Under construction Solar + storage 5.3 mi 241
Darden I Solar Contracted Solar + storage 8.2 mi 1,150
Little Bear Solar 2, LLC Contracted Solar + storage 11.8 mi 20
Helms Energy Center Postponed Gas, combustion turbine 13.4 mi 48
Iron BESS Under construction Storage 14.3 mi 59.5
Midway BESS Under construction Storage 14.3 mi 124.6

Sources CAISO · EIA-860M

Sources

  • CAISOOpen license, with credit · retrieved Nov 13, 2026Source: California ISO
  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution