Show on map
Atascocita - Crosby 138 kV — Transmission lineNoor Solar — Filed · Solar · TX · 188.2 MW · 3.5 mi awayConeflower Storage Project LLC — Contracted · Storage · TX · 170.8 MW · 5.8 mi awayGCCISD NEW TECHNOLOGY DATA CENTER — Large load · TX · 6.5 mi awayCPV Pondera King Energy Center — Postponed · Gas, combined cycle · TX · 900 MW · 9.7 mi awayCedar Bayou 5 — Under construction · Gas, combustion turbine · TX · 697 MW · 10.2 mi awayGreens Bayou 6 — Under construction · Gas, combustion turbine · TX · 445 MW · 12.4 mi awayTX LaPort 10060 Porter Road Solar — Postponed · Solar · TX · 1.6 MW · 12.5 mi awayTX Houston 7080 Express Lane — Postponed · Storage · TX · 1.5 MW · 14.0 mi awaySMT DC Houston II (Houston data centre) — Filed · Large load · TX · 14.3 mi awayBaytown — Postponed · Biomass · TX · 1.3 MW · 15.0 mi away
  • Combustion
  • Wind & solar
  • Storage
  • Loads
  • In development
  • Under construction
  • Stage not stated
  • Size not stated
  • Other infrastructure
  • 10 · 100 · 1,000 MW

Atascocita - Crosby 138 kV

Transmission line

Mapped route length
Mapped route length: sourceLBNL · Open license, with creditmiles
Voltage
138 kV
States crossed
US-TX
Owner (as stated)
Centerpoint Energy Houston Electric

Details

Who’s behind it

Owner
Centerpoint Energy Houston Electric

Interested in this project?

Set an alert
More Book a call Join the beta
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
Mapped route length (miles)
13
Substations at the ends (as the source names them)
Atascocita to Crosby
All 3 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
Attributes
AttributeValue
Owner, as the source states itcenterpoint energy houston electric
HIFLD line ID310479
Voltage class100-161 kV

Sources

1 source

Sources LBNL

Sources

  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.

Every source and license · Attribution

View at source

Around this line

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Noor Solar Filed Solar 3.5 mi 188.2
Coneflower Storage Project LLC Contracted Storage 5.8 mi 170.8
GCCISD NEW TECHNOLOGY DATA CENTER Unknown Large load 6.5 mi
CPV Pondera King Energy Center Postponed Gas, combined cycle 9.7 mi 900
Cedar Bayou 5 Under construction Gas, combustion turbine 10.2 mi 697
Greens Bayou 6 Under construction Gas, combustion turbine 12.4 mi 445
TX LaPort 10060 Porter Road Solar Postponed Solar 12.5 mi 1.6
TX Houston 7080 Express Lane Postponed Storage 14.0 mi 1.5
SMT DC Houston II (Houston data centre) Filed Large load 14.3 mi
Baytown Postponed Biomass 15.0 mi 1.3

Sources EIA-860M · ERCOT · EPA ICIS-NPDES · FAA OE/AAA

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • ERCOTOpen license · retrieved Nov 4, 2026
  • EPA ICIS-NPDESOpen license · retrieved Nov 16, 2026
  • FAA OE/AAAOpen license · retrieved Nov 16, 2026

Attribution