Show on map
- Combustion
- Clean firm
- Wind & solar
- Storage
- Loads
- In development
- Under construction
- Operating
- Stage not stated
- Size not stated
- Other infrastructure
- 10 · 100 · 1,000 MW
Map
- Combustion
- Clean firm
- Wind & solar
- Storage
- Loads
- In development
- Under construction
- Operating
- Stage not stated
- Size not stated
- Other infrastructure
ATEX: route and 50 exact-grade projects within 25 km. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
ATEX
HGL pipeline
Key facts
HGL pipeline Operating- Mapped route length
- Mapped route length: sourceEIA Energy Atlas · Open licensemiles
- States crossed
- US-AR, US-IL, US-IN, US-KY, US-LA, US-OH, US-PA, US-TX
- Operated by
- Enterprise ProductsSourceEIA US Energy Atlas — Hydrocarbon Gas Liquids (HGL) Pipelines (line geometries, operator, pipeline name)
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Mapped route length (miles)
- 1,249
- Units
- 2
All 5 attributes from EIA US Energy Atlas — Hydrocarbon Gas Liquids (HGL) Pipelines (line geometries, operator, pipeline name)
| Attribute | Value |
|---|---|
| Mapped parts | 2 |
| Operator, as the source states it | ENTERPRISE PRODUCTS |
| Mapped segments | 2 |
| Source release | 202001 |
| Pipeline name raw | ATEX |
Sources
2 sourcesSources EIA Energy Atlas · EIA US Energy Atlas — Hydrocarbon Gas Liquids (HGL) Pipelines (line geometries, operator, pipeline name)
Sources
- EIA US Energy Atlas — Hydrocarbon Gas Liquids (HGL) Pipelines (line geometries, operator, pipeline name)Source: U.S. Energy Information Administration, U.S. Energy Atlas, HGL Pipelines (as of January 2020)
- EIA US Energy Atlas — Hydrocarbon Gas Liquids (HGL) Pipelines (line geometries, operator, pipeline name)
Around this pipeline
Nearby
within 25 km| Project | Kind | Away | MW |
|---|---|---|---|
| Essex Postponed | Gas, combustion turbine | 0.4 km | 108 |
| Norris City 2 Permitted | Solar | 0.5 km | 3.2 |
| Red Glen Postponed | Gas, reciprocating engine | 0.9 km | 22 |
| City of Little Rock Solar Array Under construction | Solar | 1.5 km | 4.9 |
| Meadow Springs Renewable Energy (Hybrid) Announced | Solar + storage | 1.8 km | 300 |
| ESC Brooke County Power I Postponed | Gas, combined cycle | 1.8 km | 841.5 |
| Blue Branch Solar Under construction | Solar | 2.1 km | 35.9 |
| Morley Solar Postponed | Solar | 2.2 km | 100 |
| Trenton Solar - (OH) Under construction | Solar | 2.4 km | 9.5 |
| Ripley Solar Postponed | Solar | 2.5 km | 100 |
| TABLE MOUNTAIN INDUSTRIES LLC Built | Large load | 2.7 km | |
| Pawpaw (IL) Under construction | Solar | 2.8 km | 5 |
| Red Glen Energy Postponed | Gas, reciprocating engine | 2.8 km | 22 |
| Elliot Solar LLC Under construction | Solar | 2.9 km | 200 |
| Steubenville Solar Announced | Solar | 3.2 km | 43 |
| Coneflower Storage Project LLC Contracted | Storage | 3.3 km | 170.8 |
| ALTEC AC30-101B (Millersport data centre) Filed | Large load | 4.0 km | |
| Patoka Solar Announced | Solar | 5.1 km | 250 |
| Eastern Cottontail Solar Filed | Solar | 5.4 km | 220 |
| EDC CMH 11 and 12 Filed | Large load | 6.4 km | |
| CMH47 Land Development Bulkhead Filed | Large load | 6.6 km | |
| Cadiz Power Plant Postponed | Gas, combined cycle | 7.0 km | 1,320 |
| Hollis Creek Solar Under construction | Solar | 7.7 km | 220 |
| Trinity River Solar 1 × 2 units Filed | Solar | 8.1 km | 225 |
| DeVillez Under construction | Solar | 8.4 km | 3.3 |
| CrossTrack Solar Postponed | Solar | 8.7 km | 130 |
| ENCORE TECHNOLOGIES DATA CENTER Built | Large load | 9.0 km | |
| GCCISD NEW TECHNOLOGY DATA CENTER Unknown | Large load | 9.1 km | |
| Wylie Ridge Solar Filed | Solar | 9.1 km | 8.4 |
| Noor Solar Filed | Solar | 9.1 km | 188.2 |
| Duff Solar Park Under construction | Solar | 9.5 km | 100 |
| Cedar Bayou 5 Under construction | Gas, combustion turbine | 10.7 km | 697 |
| Robinson Power Company LLC Postponed | Gas, combined cycle | 10.7 km | 1,022.9 |
| SV CSG Angelly 1 Under construction | Solar | 12.2 km | 3.6 |
| Orange County Advanced Power Station Under construction | Gas, combined cycle | 12.2 km | 1,306 |
| Sommer Under construction | Solar | 12.4 km | 2 |
| Amelia Energy Center Postponed | Gas, combined cycle | 12.5 km | 900 |
| Jefferson Power Station Filed | Gas, combined cycle | 12.7 km | 820 |
| Spillertown CSG 1 LLC Under construction | Solar | 13.0 km | 5 |
| Nottingham Solar Under construction | Solar | 13.1 km | 100 |
| Spillertown CSG 2 LLC Under construction | Solar | 13.5 km | 5 |
| Scioto Farms Solar Postponed | Solar | 13.8 km | 110 |
| Legend Power Station Studied | Gas, other | 14.1 km | 820 |
| Union Ridge Solar Under construction | Solar | 14.1 km | 108 |
| Pulaski Solar Under construction | Solar | 14.6 km | 417.4 |
| Crossvine Solar Under construction | Solar | 15.2 km | 100 |
| CMH165 Water Tank Filed | Large load | 15.8 km | |
| CYRUSONE LLC - LEBANON DATA CENTER Built | Large load | 16.0 km | |
| New Cumberland Hydroelectric Project Filed | Hydro | 16.0 km | 20 |
Sources EIA-860M · EPA ICIS-Air · ERCOT · FAA OE/AAA · EPA ICIS-NPDES · Berkeley Lab
Sources
- EIA-860M Preliminary Monthly Electric Generator Inventory
- EPA ECHO ICIS-Air national facility download (data-centre selection, placed through FRS)
- ERCOT GIS Report (Generator Interconnection Status)
- FAA OE/AAA Part 77 obstruction evaluation case archives (data-centre sites, buildings and cranes)
- EPA ECHO ICIS-NPDES construction stormwater coverage (data-centre sites, national)
- LBNL "Queued Up" project-level interconnection queue data file (non-ISO regions)Lawrence Berkeley National Laboratory and GridTracker, Queued Up data file (2026 edition), CC BY 4.0. Modified by Inframation: non-ISO and MISO regions only; MISO rows labelled with the date the file's queue data runs to; statuses and technologies mapped to Inframation's vocabulary. Queued Up Data File. Copyright (c) 2026, The Regents of the University of California, through Lawrence Berkeley National Laboratory (subject to receipt of any required approvals from the U.S. Dept. of Energy) & GridTracker.