Atlantic Alumina, Gramercy Operations: location and 3 exact-grade projects within 15 mi. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Atlantic Alumina, Gramercy Operations
Power plant · Gas, steam turbine
Key facts
Power plant · Gas, steam turbineran 24% of 2025 Operating- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 1958
- Net generation, 2025
- 180,696 MWh
- Grid
- 14 kV to Entergy Louisiana LLC (MISO)
- Location
- St James County, Louisiana
- Operated by
- Atalco Gramercy LLC
Output
- Gas
Details
Who’s behind it
- Owner
- Rain CII Carbon LLC
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Technology
- Gas, steam turbine source: “Natural Gas Steam Turbine”
- Age
- 68 years since 1958
- Unused energy
- 567 GWh 2025Unused energyA lead, not a guarantee: MW × hours × (1 − capacity factor) for the latest year (EIA-923), gas, coal and oil plants only. Air-permit run-hour caps, heat rate (cost to run) and capacity-market or reliability obligations can rule it out.
All 5 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| EPA greenhouse gas reporting (GHGRP) |
|
| Fuel burned (MMBtu), 2025 | 9,442,038 |
| Capacity factor, 2025 | 0.242 |
| Net generation (MWh), 2025 | 180,696.3 |
| Balancing authority code | MISO |
Data notes (1)
- Heat rate (Btu/kWh), 2025 not shown: computed 52253.6 outside 5000-30000 Btu/kWh
Retirement
EIA-860M September 2026StatusSome generators have retired; the rest of the plant is still in service. As of EIA-860M for September 2026.- Capacity retired
- 32 MW
- Generators retired
- 2
- Capacity still in service
- 85.3 MW
| Generator | Technology | Nameplate | State | Date |
|---|---|---|---|---|
| GT1 | Natural Gas Fired Combustion Turbine | 16 MW | Retired | December 2006 |
| GT2 | Natural Gas Fired Combustion Turbine | 16 MW | Retired | February 2010 |
Grid
EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).- Grid voltage at the plant
- 14 kV
- Transmission or distribution system owner
- Entergy Louisiana LLC
- Balancing authority
- Midcontinent Independent Transmission System Operator, Inc..
- NERC region
- SERC
Transmission lines within 15 mi (10)
Can the connection be reused?
A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.
Ownership
2 companies2| Company | Role | Share | As of | Source |
|---|---|---|---|---|
| Atalco Gramercy LLC | Operator | EIA-860M | ||
| RAIN CII CARBON LLC | Owner | 100.0% | Dec 31, 2023 | EPA GHGRP |
Timeline
- Stated Unit GT2 scheduled to retire, 16 MW · EIA-860M
- Stated Unit GT1 scheduled to retire, 16 MW · EIA-860M
- In service · EIA-860M
Sources
5 sourcesSources EIA-860M · LBNL · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory · EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT)
Sources
- EIA-860M
- LBNLYin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.
- EIASource: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EIA-860M Preliminary Monthly Electric Generator Inventory
- EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT)
Around this plant
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| Vacherie Solar Energy Center, LLC Postponed | Solar | 6.3 mi | 150 |
| Waterford 5 Permitted | Gas, other | 11.9 mi | 478 |
| Waterford 6 Announced | Gas, combined cycle | 11.9 mi | 820 |
Sources EIA-860M · Berkeley Lab
Sources
- EIA-860M
- Berkeley LabLawrence Berkeley National Laboratory and GridTracker, Queued Up data file (2026 edition), CC BY 4.0. Modified by Inframation: non-ISO and MISO regions only; MISO rows labelled with the date the file's queue data runs to; statuses and technologies mapped to Inframation's vocabulary. Queued Up Data File. Copyright (c) 2026, The Regents of the University of California, through Lawrence Berkeley National Laboratory (subject to receipt of any required approvals from the U.S. Dept. of Energy) & GridTracker.