Power plant · Gas, reciprocating engine
Key facts
Power plant · Gas, reciprocating engineran 0% of 2025 Standby- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 1929
- Net generation, 2025
- 5 MWh
- Grid
- 4 kV to City of Augusta - (KS) (SWPP)
- Location
- Butler County, Kansas
- Operated by
- City of Augusta - (KS)SourceEIA-860M Preliminary Monthly Electric Generator Inventory
Operations
- Net generation, 2025
- 5
MWh - Fuel burned, 2025
- 134
MMBtu - Capacity factor, 2025
- 0.0
% - Heat rate, 2025
- 26,800
Btu/kWh
| Year | Net generation (MWh) | Fuel burned (MMBtu) | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|---|
| 2025 | 5 | 134 | 0.0% | 26,800 |
| 2024 | 6 | 82 | 0.0% | 13,667 |
| 2023 | -132 | 112 | — | — |
| 2022 | -168 | 56 | — | — |
| 2021 | 21 | 244 | 0.0% | 11,619 |
| 2020 | -95 | 65 | — | — |
| 2019 | -147 | 96 | — | — |
| 2018 | -173 | 64 | — | — |
| 2017 | -213 | 72 | — | — |
| 2016 | -239 | 0 | — | — |
| 2015 | -218 | 0 | — | — |
| 2014 | -258 | 0 | — | — |
| 2013 | -290 | 0 | — | — |
| 2012 | -410 | 0 | — | — |
| 2011 | -254 | 6 | — | — |
| 2010 | -312 | 41 | — | — |
| 2009 | -214 | 25 | — | — |
| 2008 | -329 | 0 | — | — |
| 2007 | -329 | 10 | — | — |
| 2006 | -263 | 951 | — | — |
| 2005 | -252 | 0 | — | — |
| 2004 | -323 | 84 | — | — |
| 2003 | 98 | 1,122 | 0.1% | 11,449 |
| 2002 | 727 | 8,063 | 0.7% | 11,091 |
| 2001 | 735 | 8,497 | 0.7% | 11,560 |
How these are worked out
Net generation and fuel burned are the monthly figures EIA publishes in its bulk electricity file, from the plant's Form 923 reports; a year is the sum of its months. Capacity factor is a full year's net generation over today's nameplate capacity times the hours in that year (8,784 in a leap year), so a plant uprated or partly retired since reads against its current size; heat rate is fuel burned over net generation, for plants that burn fuel. A year with fewer than twelve months stated has no capacity factor, and a value outside the plausible range is left blank rather than shown. By month, the charts apply the same rules to each month's own hours and fuel.