AZ State University - Tempe Campus Solar
- Wind & solar
- Operating
- 10 · 100 · 1,000 MW
Map
- Wind & solar
- Operating
AZ State University - Tempe Campus Solar: location. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
AZ State University - Tempe Campus Solar
Power plant · Solar
Key facts
Power plant · Solarran 9% of 2025 Operating- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 2003
- Net generation, 2025
- 1,924 MWh
- Grid
- 0.5 kV to Arizona Public Service Co (AZPS)
- Location
- Maricopa County, Arizona
- Operated by
- Arizona State University FDMSourceEIA-860M Preliminary Monthly Electric Generator Inventory
Operations
- Net generation, 2025
- 1,924
MWh - Fuel burned, 2025
- 6,565
MMBtu - Capacity factor, 2025
- 8.8
% - Heat rate, 2025
- Not stated
| Year | Net generation (MWh) | Fuel burned (MMBtu) | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|---|
| 2025 | 1,924 | 6,565 | 8.8% | — |
| 2024 | 1,085 | 3,701 | 4.9% | — |
| 2023 | 2,633 | 8,984 | 12.0% | — |
| 2022 | 2,632 | 8,981 | 12.0% | — |
| 2021 | 3,551 | 31,404 | 16.2% | — |
| 2020 | 3,935 | 34,498 | 17.9% | — |
| 2019 | 8,071 | 71,872 | 36.9% | — |
How these are worked out
Net generation and fuel burned are the monthly figures EIA publishes in its bulk electricity file, from the plant's Form 923 reports; a year is the sum of its months. Capacity factor is a full year's net generation over today's nameplate capacity times the hours in that year (8,784 in a leap year), so a plant uprated or partly retired since reads against its current size; heat rate is fuel burned over net generation, for plants that burn fuel. A year with fewer than twelve months stated has no capacity factor, and a value outside the plausible range is left blank rather than shown. By month, the charts apply the same rules to each month's own hours and fuel.