AZ State University - Tempe Campus Solar — Power plant · Solar · Arizona State University FDMAMERICAN AIRLINES - PHX DATA CENTER BLDG 1920 — Under construction · Large load · AZ · 2.3 mi awayIron Mountain Data Center — Under construction · Large load · AZ · 3.5 mi awayPHOENIX DATA CENTER — Built · Large load · AZ · 3.6 mi awayStack Data Center — Filed · Large load · AZ · 4.6 mi awayMCDOWELL ROAD DATA CENTER — Built · Large load · AZ · 4.7 mi awayQTS 40th Street — Filed · Large load · AZ · 4.8 mi awayThistle Data Center Crane — Filed · Large load · AZ · 8.4 mi awayCPUS WEST FRYE ROAD, LP — Built · Large load · AZ · 9.0 mi awayDIGITAL REALTY TRUST CHANDLER — Built · Large load · AZ · 10.6 mi awayCYRUSONE - CHANDLER — Built · Large load · AZ · 10.6 mi awayALIGNED PHX-04 DATA CENTER — Under construction · Large load · AZ · 10.9 mi awayPHX06 Data Center — Filed · Large load · AZ · 11.2 mi away11:11 Data Center — Filed · Large load · AZ · 14.4 mi away
  • Wind & solar
  • Loads
  • In development
  • Under construction
  • Operating
  • Size not stated
  • 10 · 100 · 1,000 MW

AZ State University - Tempe Campus Solar

Power plant · Solar

Key facts

Power plant · Solarran 9% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2003
Net generation, 2025
1,924 MWh
Grid
0.5 kV to Arizona Public Service Co (AZPS)
Location
Maricopa County, Arizona
Operated by
Arizona State University FDMSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2019 to 2025

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert
More Book a call Join the beta
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
Technology
Solar source: “Solar Photovoltaic”
Age
23 years since 2003
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Grid
Nerc region
WECC
Report year
2025
Grid voltage kv
0.500
Transmission owner
Arizona Public Service Co
Balancing authority code
AZPS
Balancing authority name
Arizona Public Service Company
Eia status
By code
OA
Mw
0.300
Units
3
OP
Mw
2.20
Units
9
Standby mw
0
Status rule
some_units_idle
In service mw
2.50
Out of service mw
0.300
Fuel burned (MMBtu), 20256,565
Capacity factor, 20250.088
Net generation (MWh), 20251,924
Balancing authority codeAZPS

Solar arrays

Array area (acres)
31.7
AC capacity (MW)
2.4
DC capacity (MW)
2.9
Mounting
Fixed tilt
Site type
Greenfield
Began operating
2003

Source USPVDB

Source

  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb

Attribution

Timeline

  • In service · EIA-860M

Sources

4 sources

Sources EIA-860M · USPVDB · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb
  • EIAOpen license · retrieved Nov 27, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
  • EIA-860M Preliminary Monthly Electric Generator Inventory

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
AMERICAN AIRLINES - PHX DATA CENTER BLDG 1920 Under construction Large load 2.3 mi
Iron Mountain Data Center Under construction Large load 3.5 mi
PHOENIX DATA CENTER Built Large load 3.6 mi
Stack Data Center Filed Large load 4.6 mi
MCDOWELL ROAD DATA CENTER Built Large load 4.7 mi
QTS 40th Street Filed Large load 4.8 mi
Thistle Data Center Crane Filed Large load 8.4 mi
CPUS WEST FRYE ROAD, LP Built Large load 9.0 mi
DIGITAL REALTY TRUST CHANDLER Built Large load 10.6 mi
CYRUSONE - CHANDLER Built Large load 10.6 mi
ALIGNED PHX-04 DATA CENTER Under construction Large load 10.9 mi
PHX06 Data Center Filed Large load 11.2 mi
11:11 Data Center Filed Large load 14.4 mi

Sources EPA ICIS-NPDES · FAA OE/AAA · EPA ICIS-Air