Show on map
Baker Point — Power plant · Solar · Cypress Creek RenewablesFrederick-Carroll County Renewable Waste — Waste to energy · MD · 56 MW · 23.9 km away
  • Wind & solar
  • Operating
  • 10 · 100 · 1,000 MW

Baker Point

Power plant · Solar

Key facts

Power plant · Solarran 18% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2016
Net generation, 2025
14,101 MWh
Grid
34 kV to The Potomac Edison Co (PJM)
Location
Frederick County, Maryland
Operated by
Cypress Creek RenewablesSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2017 to 2025

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Solar source: “Solar Photovoltaic”
Age
10 years since 2016
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Gem
Unit ids
G100000814593
Location id
L100000811992
Eia plant ids
61519
Grid
Nerc region
RFC
Report year
2025
Grid voltage kv
34.50
Transmission owner
The Potomac Edison Co
Balancing authority code
PJM
Balancing authority name
PJM Interconnection, LLC
Fuel burned (MMBtu), 202548,114
Capacity factor, 20250.179
Net generation (MWh), 202514,101
Balancing authority codePJM

Solar arrays

Array area (acres)
33.4
AC capacity (MW)
9
DC capacity (MW)
11
Mounting
Fixed tilt
Site type
Greenfield
Began operating
2016

Source USPVDB

Source

  • U.S. Large-Scale Solar Photovoltaic DatabaseOpen license · retrieved 25 Oct 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb

Attribution

Timeline

  • In service · EIA-860M

Sources

5 sources

Sources EIA-860M · GEM · USPVDB · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
Frederick-Carroll County Renewable Waste Postponed Waste to energy 23.9 km 56

Sources EIA-860M

Sources

Attribution