Baker: location and 5 exact-grade projects within 25 km. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Baker
Power plant · Storage
Key facts
Power plant · Storage Operating- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 2019
- Net generation, 2025
- -176 MWh
- Grid
- 12 kV to Southern California Edison Co (CISO)
- Location
- Orange County, California
Output
Details
Who’s behind it
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Technology
- Storage source: “Batteries”
- Age
- 7 years since 2019
All 4 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| Grid |
|
| Fuel burned (MMBtu), 2025 | 0 |
| Net generation (MWh), 2025 | -176 |
| Balancing authority code | CISO |
Data notes (1)
- Capacity factor, 2025 not shown: net generation -176.0 MWh is not positive (the plant consumed at least as much as it produced over the year)
Ownership
3 companies3| Company | Role | Share | As of | Source |
|---|---|---|---|---|
| Hybrid-Electric Building Technologies West Los Angeles 1, LLC | Operator | EIA-860M | ||
| Sk Holdings Co. Ltd. | Owner | 50.0% | 31 Dec 2025 | EIA-860 |
| SUSI Partners AG | Owner | 50.0% | 31 Dec 2025 | EIA-860 |
Timeline
- In service · EIA-860M
Sources
4 sourcesSources EIA-860M · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory · EIA-860 Annual Electric Generator Report — Schedule 4 Owner (ownership shares per generator), plus Plant/Generator schedules
Sources
- EIA-860M Preliminary Monthly Electric Generator Inventory
- EIA Open Data bulk file — Electricity (ELEC.zip; monthly plant net generation and fuel consumption since 2001)Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EIA-860M Preliminary Monthly Electric Generator Inventory
- EIA-860 Annual Electric Generator Report — Schedule 4 Owner (ownership shares per generator), plus Plant/Generator schedules
Around this plant
Nearby
within 25 km| Project | Kind | Away | MW |
|---|---|---|---|
| Margarita Energy Center Postponed | Gas, combustion turbine | 13.0 km | 48.2 |
| Hybrid Holdings 1 Capistrano Postponed | Storage | 16.2 km | 4 |
| Santa Ana Storage 3 Postponed | Storage | 17.0 km | 40 |
| Solar Photovoltaic Project #47 Postponed | Solar | 22.0 km | 1 |
| VS HR Warner NEM, LLC Under construction | Solar | 24.1 km | 1 |