Banner Solar Ironwood
Power plant · Solar
Key facts
Power plant · Solarran 32% of 2025 Operating- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 2021
- Net generation, 2025
- 3,982 MWh
- Grid
- 0.5 kV to Salt River Project (AZPS)
- Location
- Pinal County, Arizona
- Operated by
- Imperator Solar, LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory
Output
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
Set an alert
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
- Technology
- Solar source: “Solar Photovoltaic”
- Age
- 5 years since 2021
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| Gem |
|
| Grid |
|
| Fuel burned (MMBtu), 2025 | 13,588 |
| Capacity factor, 2025 | 0.325 |
| Net generation (MWh), 2025 | 3,982 |
| Balancing authority code | AZPS |
Solar array
Solar array
The array area counts panels and inverters only, not buildings, fences or the whole site.
- Array area (acres)
- 7.7
- AC capacity (MW)
- 1.4
- DC capacity (MW)
- 1.8
- Mounting
- Single-axis tracking
- Site type
- Greenfield
- Began operating
- 2021
Timeline
- In service · EIA-860M
Sources
5 sourcesSources EIA-860M · GEM · USPVDB · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory
Sources
- EIA-860M
- GEMGlobal Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
- USPVDBMap services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb
- EIASource: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EIA-860M Preliminary Monthly Electric Generator Inventory
Around this plant
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| AWS Data Center Filed | Large load | 6.1 mi | |
| Copper Crossing Energy and Research Cent Postponed | Gas, combustion turbine | 6.3 mi | 1,779 |
| MECP1 MESA INTERMEDIATE 1 Built | Large load | 8.1 mi | |
| Edged Data Center Filed | Large load | 9.4 mi | |
| PLATYPUS DEVELOPMENT Built | Large load | 9.4 mi | |
| NDA MESA DATA CENTER Built | Large load | 9.5 mi | |
| EdgeCore Under construction | Large load | 9.6 mi | |
| MICROSOFT PHX 16 DATA CENTER Under construction | Large load | 9.7 mi | |
| Mesa Data Center Under construction | Large load | 9.8 mi | |
| NTT Ph4 POINT 2 Filed | Large load | 10.1 mi | |
| NTT PH1 DATA CENTER Under construction | Large load | 10.2 mi | |
| COMARCH PHOENIX DATA CENTER Built | Large load | 10.7 mi | |
| Edgeconnex Filed | Large load | 10.9 mi | |
| NTT PH 5 Filed | Large load | 11.2 mi | |
| RED HAWK PH 3 (Mesa data centre) Filed | Large load | 11.4 mi | |
| Box Canyon (AZ) Postponed | Storage | 12.0 mi | 300 |