Show on map
Banner Solar Ironwood — Power plant · Solar · Imperator Solar, LLCAWS Data Center — Filed · Large load · AZ · 6.1 mi awayCopper Crossing Energy and Research Cent — Postponed · Gas, combustion turbine · AZ · 1,779 MW · 6.3 mi awayMECP1 MESA INTERMEDIATE 1 — Built · Large load · AZ · 8.1 mi awayEdged Data Center — Filed · Large load · AZ · 9.4 mi awayPLATYPUS DEVELOPMENT — Built · Large load · AZ · 9.4 mi awayNDA MESA DATA CENTER — Built · Large load · AZ · 9.5 mi awayEdgeCore — Under construction · Large load · AZ · 9.6 mi awayMICROSOFT PHX 16 DATA CENTER — Under construction · Large load · AZ · 9.7 mi awayMesa Data Center — Under construction · Large load · AZ · 9.8 mi awayNTT Ph4 POINT 2 — Filed · Large load · AZ · 10.1 mi awayNTT PH1 DATA CENTER — Under construction · Large load · AZ · 10.2 mi awayCOMARCH PHOENIX DATA CENTER — Built · Large load · AZ · 10.7 mi awayEdgeconnex — Filed · Large load · AZ · 10.9 mi awayNTT PH 5 — Filed · Large load · AZ · 11.2 mi awayRED HAWK PH 3 (Mesa data centre) — Filed · Large load · AZ · 11.4 mi awayBox Canyon (AZ) — Postponed · Storage · AZ · 300 MW · 12.0 mi away
  • Wind & solar
  • Loads
  • In development
  • Under construction
  • Operating
  • Size not stated
  • 10 · 100 · 1,000 MW

Banner Solar Ironwood

Power plant · Solar

Key facts

Power plant · Solarran 32% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2021
Net generation, 2025
3,982 MWh
Grid
0.5 kV to Salt River Project (AZPS)
Location
Pinal County, Arizona
Operated by
Imperator Solar, LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2024 to 2025

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert
More Book a call Join the beta
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
Technology
Solar source: “Solar Photovoltaic”
Age
5 years since 2021
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Gem
Unit ids
G100001058197
Location id
L100001050453
Eia plant ids
68433
Grid
Nerc region
WECC
Report year
2025
Grid voltage kv
0.500
Transmission owner
Salt River Project
Balancing authority code
AZPS
Balancing authority name
Arizona Public Service Company
Fuel burned (MMBtu), 202513,588
Capacity factor, 20250.325
Net generation (MWh), 20253,982
Balancing authority codeAZPS

Solar array

Array area (acres)
7.7
AC capacity (MW)
1.4
DC capacity (MW)
1.8
Mounting
Single-axis tracking
Site type
Greenfield
Began operating
2021

Source USPVDB

Source

  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb

Attribution

Timeline

  • In service · EIA-860M

Sources

5 sources

Sources EIA-860M · GEM · USPVDB · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
  • EIA-860M Preliminary Monthly Electric Generator Inventory

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
AWS Data Center Filed Large load 6.1 mi
Copper Crossing Energy and Research Cent Postponed Gas, combustion turbine 6.3 mi 1,779
MECP1 MESA INTERMEDIATE 1 Built Large load 8.1 mi
Edged Data Center Filed Large load 9.4 mi
PLATYPUS DEVELOPMENT Built Large load 9.4 mi
NDA MESA DATA CENTER Built Large load 9.5 mi
EdgeCore Under construction Large load 9.6 mi
MICROSOFT PHX 16 DATA CENTER Under construction Large load 9.7 mi
Mesa Data Center Under construction Large load 9.8 mi
NTT Ph4 POINT 2 Filed Large load 10.1 mi
NTT PH1 DATA CENTER Under construction Large load 10.2 mi
COMARCH PHOENIX DATA CENTER Built Large load 10.7 mi
Edgeconnex Filed Large load 10.9 mi
NTT PH 5 Filed Large load 11.2 mi
RED HAWK PH 3 (Mesa data centre) Filed Large load 11.4 mi
Box Canyon (AZ) Postponed Storage 12.0 mi 300

Sources FAA OE/AAA · EIA-860M · EPA ICIS-Air · EPA ICIS-NPDES

Sources

Attribution