Edged Data Center
Data center
- Kind
- Data center
- Location
- Maricopa County, Arizona
Details
Who’s behind it
- Developer
- Edged Energy
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Kind
- Data center source: “Data Center”
- Capacity (MW)
- Not stated
Timeline
- Observed as filed in FAA OE/AAA (source status: “Determined - No Hazard”).
“Stated” dates are the source’s plan, not a commitment.
About these dates
Status and dates as the source last listed them. Later changes follow as we see them.
Sources
1 sourceSources FAA OE/AAA
Around this project
Nearby
within 25 km| Project | Kind | Away | MW |
|---|---|---|---|
| NDA MESA DATA CENTER Built | Large load | 0.1 km | |
| Edgeconnex Filed | Large load | 2.4 km | |
| EdgeCore Under construction | Large load | 2.5 km | |
| Mesa Data Center Under construction | Large load | 2.5 km | |
| COMARCH PHOENIX DATA CENTER Built | Large load | 2.8 km | |
| NTT PH 5 Filed | Large load | 2.9 km | |
| RED HAWK PH 3 (Mesa data centre) Filed | Large load | 3.5 km | |
| MECP1 MESA INTERMEDIATE 1 Built | Large load | 3.6 km | |
| NTT PH1 DATA CENTER Under construction | Large load | 3.9 km | |
| NTT Ph4 POINT 2 Filed | Large load | 4.0 km | |
| PLATYPUS DEVELOPMENT Built | Large load | 4.4 km | |
| AWS Data Center Filed | Large load | 5.5 km | |
| MICROSOFT PHX 16 DATA CENTER Under construction | Large load | 12.1 km | |
| CPUS WEST FRYE ROAD, LP Built | Large load | 22.7 km | |
| CYRUSONE - CHANDLER Built | Large load | 23.2 km | |
| DIGITAL REALTY TRUST CHANDLER Built | Large load | 23.6 km | |
| PHX06 Data Center Filed | Large load | 23.6 km | |
| ALIGNED PHX-04 DATA CENTER Under construction | Large load | 23.6 km | |
| Copper Crossing Energy and Research Cent Postponed | Gas, combustion turbine | 24.8 km | 1,779 |
Sources EPA ICIS-NPDES · FAA OE/AAA · EPA ICIS-Air · EIA-860M
Sources
- EPA ECHO ICIS-NPDES construction stormwater coverage (data-centre sites, national)
- FAA OE/AAA Part 77 obstruction evaluation case archives (data-centre sites, buildings and cranes)
- EPA ECHO ICIS-Air national facility download (data-centre selection, placed through FRS)
- EIA-860M Preliminary Monthly Electric Generator Inventory