Show on map
Barre — Power plant · Biomass · Zapco Energy Tactics CorpSturbridge Road Solar — Solar · MA · 5 MW · 24.2 km away
  • Wind & solar
  • Bioenergy
  • Under construction
  • Retired
  • 10 · 100 · 1,000 MW

Power plant · Biomass

Key facts

Power plant · Biomassran 37% of 2017 Retired
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1996
Net generation, 2017
3,240 MWh
Location
Worcester County, Massachusetts
Operated by
Zapco Energy Tactics CorpSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2002 to 2017
Fuel burned MMBtu by year, 2002 to 2017
  • Biomass and waste

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Biomass source: “Landfill Gas”
Age
30 years since 1996
1 attribute from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Balancing authority codeISNE

Retirement

EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.
Retired
December 2017
Capacity retired
1 MW
Generators retired
2
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
BA1Landfill Gas0.5 MWRetiredDecember 2017
BA2Landfill Gas0.5 MWRetiredDecember 2017

Grid

EIA-860Grid fieldsAs the plant reported them to EIA-860 (Schedule 2).
Balancing authority
ISNE
Transmission lines within 25 km (8)
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Timeline

  • Stated Units BA1, BA2 scheduled to retire, 1 MW · EIA-860M
  • In service · EIA-860M

Sources

4 sources

Sources EIA-860M · LBNL · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
Sturbridge Road Solar Under construction Solar 24.2 km 5

Sources EIA-860M

Sources

Attribution