Barrow — Power plant · Gas, combustion turbine · Barrow Utils & Elec Coop, Inc
  • Combustion
  • Operating
  • 10 · 100 · 1,000 MW

Power plant · Gas, combustion turbine

Key facts

Power plant · Gas, combustion turbineran 30% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1977
Net generation, 2025
44,915 MWh
Grid
4 kV to Barrow Utils & Elec Coop, Inc
Location
North Slope County, Alaska

Output

Net generation MWh by year, 2001 to 2025
Fuel burned MMBtu by year, 2001 to 2025
  • Gas
  • Oil

Operations detail

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Gas, combustion turbine source: “Natural Gas Fired Combustion Turbine”
Age
49 years since 1977
Unused energy
107 GWh 2025Unused energyA lead, not a guarantee: MW × hours × (1 − capacity factor) for the latest year (EIA-923), gas, coal and oil plants only. Air-permit run-hour caps, heat rate (cost to run) and capacity-market or reliability obligations can rule it out.
Heat rate
17,852 Btu/kWh 2025
All 5 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
EPA greenhouse gas reporting (GHGRP)
EPA FRS ID
110045587584
Subparts reported
C
NAICS code
221112
Subpart PP (CO2 supply)
No
Subpart RR (geologic sequestration)
No
Subpart UU (CO2 injection)
No
Reporting year
2023
GHGRP facility ID
1005395
Fuel burned (MMBtu), 2025801,819
Capacity factor, 20250.296
Heat rate (Btu/kWh), 202517,851.9
Net generation (MWh), 202544,915

Retirement

EIA-860M September 2026StatusSome generators have retired; the rest of the plant is still in service. As of EIA-860M for September 2026.
Capacity retired
3 MW
Generators retired
2
Capacity still in service
17.3 MW
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
10Natural Gas Internal Combustion Engine1.5 MWRetiredNovember 2022
9Natural Gas Internal Combustion Engine1.5 MWRetiredNovember 2022

Grid

EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).
Grid voltage at the plant
4 kV
Transmission or distribution system owner
Barrow Utils & Elec Coop, Inc
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Ownership

3 companies3
Companies with an ownership or operating interest in this asset.
CompanyRoleShareAs ofSource
Barrow Utils & Elec Coop, Inc Operator EIA-860M
BARROW UTILITIES & ELECTRIC COOPERATIVE INC Owner 100.0% 31 Dec 2023 EPA GHGRP
North Slope Borough Power & Light (AK) Owner 43.4% 31 Dec 2025 EIA-860

Timeline

  • Stated Units 10, 9 scheduled to retire, 3 MW · EIA-860M
  • In service · EIA-860M