Show on map
Bartow Anclote Hot Oil Pipeline — Petroleum product pipeline · Duke EnergySouth Tampa Energy Storage — Postponed · Storage · FL · 20 MW · 4.9 mi awayH L Culbreath Bayside Power Station — Postponed · Gas, combustion turbine · FL · 503.8 MW · 10.9 mi awayTampa Electric Co NA 2 — Postponed · Gas, combustion turbine · FL · 982 MW · 10.9 mi awayBig Bend III Battery Storage — Permitted · Storage · FL · 75 MW · 12.5 mi awayTampa Electric Co NA 3 — Postponed · Gas, combustion turbine · FL · 99 MW · 12.7 mi away
  • Storage
  • In development
  • Other infrastructure
  • 10 · 100 · 1,000 MW

Bartow Anclote Hot Oil Pipeline

Petroleum product pipeline

Key facts

Petroleum product pipeline Operating
Mapped route length
Mapped route length: sourceEIA Energy Atlas · Open licensemiles
States crossed
US-FL
Operated by
Duke EnergySourceEIA US Energy Atlas — Petroleum Product Pipelines (line geometries, operator, pipeline name)

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert
More Book a call Join the beta
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
Mapped route length (miles)
31
Units
1
All 5 attributes from EIA US Energy Atlas — Petroleum Product Pipelines (line geometries, operator, pipeline name)
Attributes
AttributeValue
Mapped parts1
Operator, as the source states itDUKE ENERGY
Mapped segments1
Source release202001
Pipeline name rawBartow Anclote Hot Oil Pipeline

Sources

2 sources

Sources EIA Energy Atlas · EIA US Energy Atlas — Petroleum Product Pipelines (line geometries, operator, pipeline name)

Sources

Every source and license · Attribution

View at source

Around this pipeline

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
South Tampa Energy Storage Postponed Storage 4.9 mi 20
H L Culbreath Bayside Power Station Postponed Gas, combustion turbine 10.9 mi 503.8
Tampa Electric Co NA 2 Postponed Gas, combustion turbine 10.9 mi 982
Big Bend III Battery Storage Permitted Storage 12.5 mi 75
Tampa Electric Co NA 3 Postponed Gas, combustion turbine 12.7 mi 99

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution